Strategic Action Plan - International Environmental Technology Centre
Strategic Action Plan - International Environmental Technology Centre
Strategic Action Plan - International Environmental Technology Centre
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
OPTIMISATION AND STRENGTHENING OF<br />
MUNICIPAL SOLID WASTE (MSW) COLLECTION<br />
SYSTEMS<br />
Target:<br />
‣ To suggest and investigate various methods for optimizing and strengthening of<br />
the MSW Collection systems.<br />
Lead Agency: Pune Municipal Corporation (PMC) – Transport Department and Town<br />
<strong>Plan</strong>ning Department<br />
Support Agency: ISWM Cell, PMC and use the service of consultants, NGO’s, generators<br />
and housing societies.<br />
Location (Suggested): City wide – taken up for the entire city of Pune. GIS based models<br />
can be prepared and implemented throughout Pune for properly defined collection systems.<br />
Implementing may be done in phases based on the ward prioritization.<br />
Description: PMC should use the services of a consultant to develop a model for optimized waste<br />
collection systems. The consultant can investigate several waste management collection models<br />
available and then shortlist the model which is most suitable for Pune city. The tracking of<br />
the waste from source to the end disposal site can be done with the help of Geographic<br />
Information System aided with Global positioning system. In GIS, as the work is carried in<br />
layers, there are least chances of confusion or error and the system is capable enough to<br />
coordinate between spatial and non spatial data.<br />
Aspects of Route optimization: Various Aspects of route optimization are depicted in<br />
Figure at the side. The figure depicts the various levels which decide route of a waste carrier<br />
(shown in colored boxes) and the factors which need to be considered for efficient route<br />
management (shown in white boxes).<br />
Budget (Estimated): Rs. 10 Million<br />
3 R INITIATIVES<br />
SCHEME 1<br />
PROJECT<br />
G3 – O1, G3 – O2<br />
Links to other ISWM<br />
Pune Schemes:<br />
‣ Inventorization of<br />
Solid Waste<br />
‣ Establishment of<br />
Community Sorting<br />
<strong>Centre</strong>s<br />
‣ Private Partnerships<br />
in waste collection<br />
and management<br />
system<br />
‣ Establish Take back<br />
policy for E-Wastes<br />
‣ Demonstration<br />
Projects for Hotel<br />
Waste Management<br />
‣ Introducing Industry-<br />
University<br />
Partnerships<br />
‣ Strengthening of<br />
PMC Rag picker Cooperatives<br />
‣ C&D Waste<br />
Management<br />
Timeframe (Estimated):<br />
22 months<br />
Benefits:<br />
Bin Design, Vehicle<br />
Design<br />
Choice of<br />
<strong>Technology</strong>/<br />
Decentralised<br />
treatments and<br />
Facilities for sorting<br />
and recycling<br />
Bin Siting<br />
Routes /<br />
Allocation<br />
Prioritizing<br />
decentralization<br />
Transfer<br />
Stations<br />
BRC<br />
Routing can<br />
Scheduling<br />
Optimisation<br />
Techniques<br />
• Monitoring the<br />
waste at every stage<br />
• Improved operation<br />
and cost efficiency<br />
for waste<br />
management<br />
• <strong>Plan</strong>ning for<br />
strategic bin location<br />
that serves the local<br />
population<br />
• Route optimization<br />
from collection<br />
point to the landfill<br />
site which can save<br />
fuel cost and the<br />
reduction in trips<br />
and time for the<br />
waste travel<br />
• To increase<br />
efficiency of the<br />
transport logistic<br />
ISWM <strong>Plan</strong> for Pune 138