20.10.2014 Views

Strategic Action Plan - International Environmental Technology Centre

Strategic Action Plan - International Environmental Technology Centre

Strategic Action Plan - International Environmental Technology Centre

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OPTIMISATION AND STRENGTHENING OF<br />

MUNICIPAL SOLID WASTE (MSW) COLLECTION<br />

SYSTEMS<br />

Target:<br />

‣ To suggest and investigate various methods for optimizing and strengthening of<br />

the MSW Collection systems.<br />

Lead Agency: Pune Municipal Corporation (PMC) – Transport Department and Town<br />

<strong>Plan</strong>ning Department<br />

Support Agency: ISWM Cell, PMC and use the service of consultants, NGO’s, generators<br />

and housing societies.<br />

Location (Suggested): City wide – taken up for the entire city of Pune. GIS based models<br />

can be prepared and implemented throughout Pune for properly defined collection systems.<br />

Implementing may be done in phases based on the ward prioritization.<br />

Description: PMC should use the services of a consultant to develop a model for optimized waste<br />

collection systems. The consultant can investigate several waste management collection models<br />

available and then shortlist the model which is most suitable for Pune city. The tracking of<br />

the waste from source to the end disposal site can be done with the help of Geographic<br />

Information System aided with Global positioning system. In GIS, as the work is carried in<br />

layers, there are least chances of confusion or error and the system is capable enough to<br />

coordinate between spatial and non spatial data.<br />

Aspects of Route optimization: Various Aspects of route optimization are depicted in<br />

Figure at the side. The figure depicts the various levels which decide route of a waste carrier<br />

(shown in colored boxes) and the factors which need to be considered for efficient route<br />

management (shown in white boxes).<br />

Budget (Estimated): Rs. 10 Million<br />

3 R INITIATIVES<br />

SCHEME 1<br />

PROJECT<br />

G3 – O1, G3 – O2<br />

Links to other ISWM<br />

Pune Schemes:<br />

‣ Inventorization of<br />

Solid Waste<br />

‣ Establishment of<br />

Community Sorting<br />

<strong>Centre</strong>s<br />

‣ Private Partnerships<br />

in waste collection<br />

and management<br />

system<br />

‣ Establish Take back<br />

policy for E-Wastes<br />

‣ Demonstration<br />

Projects for Hotel<br />

Waste Management<br />

‣ Introducing Industry-<br />

University<br />

Partnerships<br />

‣ Strengthening of<br />

PMC Rag picker Cooperatives<br />

‣ C&D Waste<br />

Management<br />

Timeframe (Estimated):<br />

22 months<br />

Benefits:<br />

Bin Design, Vehicle<br />

Design<br />

Choice of<br />

<strong>Technology</strong>/<br />

Decentralised<br />

treatments and<br />

Facilities for sorting<br />

and recycling<br />

Bin Siting<br />

Routes /<br />

Allocation<br />

Prioritizing<br />

decentralization<br />

Transfer<br />

Stations<br />

BRC<br />

Routing can<br />

Scheduling<br />

Optimisation<br />

Techniques<br />

• Monitoring the<br />

waste at every stage<br />

• Improved operation<br />

and cost efficiency<br />

for waste<br />

management<br />

• <strong>Plan</strong>ning for<br />

strategic bin location<br />

that serves the local<br />

population<br />

• Route optimization<br />

from collection<br />

point to the landfill<br />

site which can save<br />

fuel cost and the<br />

reduction in trips<br />

and time for the<br />

waste travel<br />

• To increase<br />

efficiency of the<br />

transport logistic<br />

ISWM <strong>Plan</strong> for Pune 138

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!