In the context of Bio-medical Waste (BMW), the requirements have been spelled out in Bio-Medical<br />

(Management and Handling) Rules, 1998 as (amended subsequently). The requirements under this<br />

regulation and their implementation status are given in Table 3.9.<br />

Sl.<br />

No.<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

9<br />

10<br />

11<br />

Table 3.9: Review of Regulatory Requirements on BMW<br />

Requirement<br />

To take all steps to ensure<br />

that such waste is handled<br />

safely<br />

Waste to be treated and<br />

disposed<br />

Generator to set up<br />

requisite BMW treatment<br />

facilities or ensure the same<br />

at a common waste<br />

treatment facility<br />

Waste be segregated into<br />

containers/bags<br />

The container containing<br />

BMW should be labeled<br />

with information about the<br />

waste<br />

Waste be transported in<br />

vehicle that is authorised for<br />

the purpose by the<br />

competent authority<br />

No untreated BMW to be<br />

stored beyond a period of<br />

48 hours.<br />

To pick up and transport<br />

segregated non bio medical<br />

solid waste generated for<br />

disposal<br />

To provide suitable<br />

common disposal/<br />

incineration site<br />

Responsibility<br />

Generator<br />

Generator<br />

Generator<br />

Generator<br />

Generator<br />

Generator<br />

and/or<br />

operator of the<br />

common<br />

treatment<br />

facility<br />

Generator<br />

Municipal<br />

Authority<br />

Municipal<br />

Authority<br />

Level of<br />

Implementation<br />

Lacking<br />

Partial compliance<br />

Service provided to<br />

generators through a<br />

service provider<br />

Segregated to a large<br />

extent but the levels of<br />

segregation to be<br />

increased<br />

Mostly comply<br />

In compliance<br />

Mostly comply<br />

Partially covered<br />

Complied<br />

Remarks<br />

Poor levels of<br />

awareness<br />

Needs<br />

attention<br />

immediate<br />

Presently estimated as<br />

50% coverage<br />

Needs to 100%<br />

Lack of enforcement;<br />

Lack of awareness<br />

Lack of awareness as<br />

well as enforcement<br />

Lack of awareness as<br />

well as enforcement<br />

Implementation levels to<br />

be increased<br />

For the industrial waste generated, the requirements for the hazardous waste component have been<br />

spelled out in Hazardous Waste (Management and Handling) Rules, 1989 (as amended subsequently).<br />

The requirements under this regulation and their implementation status are given in Table 3.10.<br />