WHC-SD-EN-TI-136, Rev. 0<br />

RL--WHC-WHC600EM-1990-0337 10 Day Update<br />

UNOFFICIAL COPY (Incomplete )<br />

OCCURRENCE REPORT<br />

23. EVALUATI'ON : (By Facility Manager/Designee)<br />

Current plan is to remove the layer of contaminated soil<br />

from the tank impression, sample for organic vapors and<br />

backfill once the excavation is clean.<br />

24. IS FURTHER EVALUATION REQUIRED? :Yes [I No [X]<br />

IF YES - BEFORE FURTHER OPERATION? Yes [] No [X]<br />

BY WHOM?:<br />

BY WHEN? :----<br />

25. CORRECTIVE ACTIONS<br />

(* Date added/revised since final report was signed off)<br />

1) On 1991/01/04, the contaminated soil was removed from the<br />

tank impression and the site cleared. Resampling of the<br />

site is being scheduled prior to backfilling.<br />

TARGET COMPLETION DATE: --- /-COMPLETION DATE: -/--<br />

26. IMPACT ON ENVIRONMENT, SAFETY AND HEALTH:<br />

No worker was exposed to gasoline vapors during the<br />

excavation of the tank. The total quantity of the spills is<br />

unknown except for the reported spill January 18, 1988.<br />

Impact to the environment was minimal. Approximately 3<br />

cubic yards of soil was contaminated.<br />

Impact Oversight Group: Environmental Assurance<br />

27. PROGRAMMATIC IMPACT<br />

None at this time.<br />

28. IMPACT UPON CODES AND STANDARDS<br />

The excavation of the tank was in accordance with the<br />

requirements of 40 CFR 280.71. No changes are required to<br />

existing procedures.<br />