RL--WHC-NREACTOR-1991-10Oo WHC-SD-EN-TI-136, Rev. 0 Final Report<br />

UNOFFICIAL COPY (Incomplete)<br />

OCCURRENCE REPORT<br />

SS-27 site, tank 100N-SS-28 was removed in July 1991. At the<br />

time of the removal of IOON-SS-28, saturated soil was<br />

observed in the tank depression. There had been no petroleum<br />

in the 100N-SS-28 tank. The saturated soil was approximately<br />

12 feet below land surface. The soil was removed and placed<br />

in four 55 gallon hazardous waste drums and disposed of as a<br />

hazardous waste. In July and August of 1991 groundwater<br />

samples were collected and tested for volatile organics. The<br />

analytical results indicated that no hydrocarbon<br />

contamination is present in the groundwater.<br />

In September 1991 the UST site was excavated from 14 feet to<br />

27 feet below the land surface. At that depth, contaminated<br />

soil was found. This soil was removed and placed in plastic<br />

sheeting, bermed, and barricaded.<br />

In order to determine the extent of the petroleum<br />

contamination, it is planned to drill two wells, since the<br />

site may not be able to be clean closed. These wells are to<br />

be placed at the plume location and down gradient of the<br />

service station. This additional work is planned to be<br />

completed by mid-December 1993.<br />

The corrective actions associated with this incident are<br />

also being tracked on occurrence report RL--WHC-WHC600EM-<br />

1990-0337.<br />

30. SIMILAR OCCURRENCE REPORT NUMBERS:<br />

RL--WHC-WHC600EM-19go-0337<br />

31. DOE FACILITY REPRESENTATIVE INPUT:<br />

This report has been reviewed and revised several times to<br />

clarify and correct mistakes. It has been reviewed and found<br />

to be acceptable at this time. The reviews have been done by<br />

both Charlie Loftis, DOE-RL site representative as well as by<br />

D.W. Templeton, Chief, Facility Surveillance Branch.<br />

Entered by: Templeton, Dave W. Date: 05/29/92<br />