RL--WHC-NREACTOR- 1991-1030 WHC-SD-EN-TI-136, Rev. 0 Final Report<br />

UNOFFICIAL COPY (Incomplete)<br />

OCCURRENCE REPORT<br />

Therefore, the cause is determined to be the result of<br />

inadequate administrative control of the servicing<br />

activities at this station in the past, resulting in<br />

spillage and consequent soil contamination.<br />

23. EVALUATION :(By Facility Manager/Designee)<br />

See item #29<br />

24. IS FURTHER EVALUATION REQUIRED? Yes (] No [X]<br />

IF YES - BEFORE FURTHER OPERATION? Yes [] No [X]<br />

BY WHOM?:<br />

BY WHEN? :----<br />

25. CORRECTIVE ACTIONS<br />

(* Date added/revised since final report was signed off)<br />

1) Complete site drilling, soil sampling and field analysis of<br />

samples.<br />

ACTIONEE: D.J. Watson (11120)<br />

TARGET COMPLETION DATE: 08/01/92 COMPLETION DATE: 08/15/92<br />

2) Scope remaining site remedial actions.<br />

ACTIONEE: D.J. Watson (11120)<br />

TARGET COMPLETION DATE: 01/31/93 COMPLETION DATE: 01/27/93<br />

3) Complete soil sample laboratory analysis, review analysis,<br />

validate data and schedule any additional corrective actions<br />

that may be determined to be necessary at that time.<br />

ACTIONEE: D.J. Watson (11120)<br />

TARGET COMPLETION DATE: 12/01/92 COMPLETION DATE: 12/01/92<br />

4) Implement remedial action schedule.<br />

ACTIONEE: D.J. Watson (11120)<br />

TARGET COMPLETION DATE: 03/31/93 COMPLETION DATE: -/--<br />

1993/02/02 page 4<br />