13.07.2015 Views

Guide to COST-BENEFIT ANALYSIS of investment projects - Ramiri

Guide to COST-BENEFIT ANALYSIS of investment projects - Ramiri

Guide to COST-BENEFIT ANALYSIS of investment projects - Ramiri

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 4.61 Probability parametersENPV (Millions <strong>of</strong> Euros)ERR%Reference value (baseline case) 3.53 6.68Mean 3.42 6.50Median 3.64 6.71Standard deviation 10.66 3.55Minimum value -29.29 -5.62Central value Mode 2.90 5.35Maximum value 35.16 16.31Figure 4.17 Probability distribution <strong>of</strong> ENPVPunctual probabilityReference valueCentralMeanSD uppCumulated probabilityMinimumMaximumSD lowMedian1.000.900.800.700.600.500.400.300.200.100.00-40,000 -30,000 -20,000 -10,000 0 10,000 20,000 30,000 40,000Figure 4.18 Probability distribution <strong>of</strong> ERRPunctual probabilityCumulated probabilityReference valueMinimumCentralMaxim umMeanSD lowSD upp1.00Median0.900.800.700.600.500.400.300.200.100.00-10.0% -5.0% 0.0% 5.0% 10.0% 15.0% 20.0%193

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!