13.07.2015 Views

Guide to COST-BENEFIT ANALYSIS of investment projects - Ramiri

Guide to COST-BENEFIT ANALYSIS of investment projects - Ramiri

Guide to COST-BENEFIT ANALYSIS of investment projects - Ramiri

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 2.14 Impact analysis <strong>of</strong> critical variablesCategories Parameters ElasticityHigh Intermediate Lowrate <strong>of</strong> inflationXPrice dynamicschange <strong>of</strong> personnel costsXchange <strong>of</strong> energy pricesXchange <strong>of</strong> prices <strong>of</strong> goods and servicesXspecific consumptionXDemand data rate <strong>of</strong> demographic growthXvolume <strong>of</strong> trafficXInvestment costs hourly labour construction cost XAn example <strong>of</strong> a possible result <strong>of</strong> the sensitivity analysis is shown in Figure 2.5: according <strong>to</strong> theaforementioned general criterion (a variation <strong>of</strong> the variable <strong>of</strong> 1% corresponds <strong>to</strong> at least onepercentage point variation in NPV), the critical variables are demand and productivity, while energycost and input prices are below the threshold.Figure 2.5 Sensitivity analysis10.0%7.5%5.0%2.5%FRR0.0%-5% -4% -3% -2% -1% 0%-2.5%1% 2% 3% 4% 5%-5.0%-7.5%-10.0%Parameterenergy cost input prices demand productivityFOCUS: THE SWITCHING VALUEThe switching value <strong>of</strong> a variable is that value that would have <strong>to</strong> occur in order for the NPV <strong>of</strong> the project <strong>to</strong> become zero, ormore generally, for the outcome <strong>of</strong> the project <strong>to</strong> fall below the minimum level <strong>of</strong> acceptability.The use <strong>of</strong> switching values in sensitivity analysis allows appraisers <strong>to</strong> make some judgements on the riskiness <strong>of</strong> the project andthe opportunity <strong>of</strong> undertaking risk-preventing actions. For example if one <strong>of</strong> the critical variables <strong>of</strong> a transport project is‘forecasted demand’ and its switching value is -20%, then the proposer can evaluate if the conditions for such a decrease existand, in a positive case may consider preventing actions (e.g. tariffs reduction).The following table provides some examples <strong>of</strong> switching values for an agricultural project:Variable Switching Value (%)- Yield per hectare - 25- Construction costs 40- Irrigated area per pump -50- Shadow exchange rate 60Source: adapted from Belli P. et al., Economic analysis <strong>of</strong> <strong>investment</strong> operations (2001)60

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!