13.07.2015 Views

Handbook for Methane Control in Mining - AMMSA

Handbook for Methane Control in Mining - AMMSA

Handbook for Methane Control in Mining - AMMSA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

9211. At the surface <strong>in</strong>stallation (Figure 6–13), a commercially made flame arrestor will be<strong>in</strong>stalled with<strong>in</strong> 10 ft of the top of the vent stack. A check valve shall be used to guard aga<strong>in</strong>streversal of flow. The check valve can be manually defeated if it is desired to purge the pipel<strong>in</strong>e<strong>for</strong> repairs. An orifice meter may be <strong>in</strong>stalled if needed. All surface <strong>in</strong>stallations will be periodically<strong>in</strong>spected to ensure satisfactory per<strong>for</strong>mance.12. All boreholes drilled <strong>for</strong> degasification will be accurately surveyed either dur<strong>in</strong>g or afterdrill<strong>in</strong>g is completed us<strong>in</strong>g commercially available borehole survey<strong>in</strong>g tools. These boreholeswill be accurately plotted on m<strong>in</strong>e maps to prevent any <strong>in</strong>advertent m<strong>in</strong><strong>in</strong>g through them.13. Should an occasion arise <strong>in</strong> the future when cutt<strong>in</strong>g <strong>in</strong>to an abandoned, unplugged boreholewill be necessary, a detailed m<strong>in</strong><strong>in</strong>g plan will be submitted to MSHA.14. A compressor will be required at the surface if beneficial use is made of the gas at a futuredate. Plans <strong>for</strong> <strong>in</strong>stallation will be discussed with MSHA at the appropriate time.Figure 6–13.—Surface <strong>in</strong>stallation <strong>for</strong> horizontal dra<strong>in</strong>age boreholes.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!