SUN INTERNATIONAL ANNUAL REPORT ’10<br />

INTERNATIONAL EXPANSION<br />

Chile<br />

Two months after the ‘official’ opening of our Monticello Grand Casino<br />

and Entertainment World in Chile in December 2009, the southern part<br />

of the country was hit by its second largest ever recorded earthquake,<br />

measuring 8.8, turning the region into a national disaster area. After<br />

extensive repairs, the casino re-opened on 30 June.<br />

54<br />

THE EARTHQUAKE AT MONTICELLO<br />

Fortunately for the 4 500 guests and staff who were at Monticello<br />

when the quake struck, there was no loss of life and all were<br />

evacuated within 15 minutes, after which security shut down<br />

the power and water. Transport to the complex – normally a<br />

45 minute trip from Santiago – was transformed into a four-hour<br />

ordeal across collapsed roads.<br />

The road infrastructure has been restored. While the damage<br />

to the complex amounted to US$8.2 million, there was no<br />

significant structural damage to the buildings. Four months<br />

after repair works began, Monticello reopened its doors to the<br />

public on the last day of the financial year. It has traded<br />

strongly in the first two months after reopening and indications<br />

are that it will continue to do so.<br />

Structurally the buildings withstood the earthquake but the<br />

water from the fire system caused major damage to carpets and<br />

shopfittings. The force of the quake resulted in major cosmetic<br />

damage, cracking marble fittings, tiles, ceilings, drywalling and<br />

architectural finishes.<br />

It took Monticello management a week to complete a basic<br />

cleanup in consultation with the insurers. In spite of significant<br />

challenges such as a lack of building materials, a depleted labour<br />

force and escalated prices following the quake, the casino doors<br />

reopened to the public on 30 June, with many customers<br />

queuing for up to 90 minutes in anticipation of re-entering their<br />

favourite casino and entertainment destination.<br />

Nigeria<br />

In Lagos, Nigeria, we opened the new casino at the Federal Palace Hotel. In<br />

the first month of operations, more than 3 000 guests visited the casino’s<br />

200 slot machines and eight gaming tables. The hotel’s 500-seater<br />

permanent marquee was completed and bookings have exceeded<br />

expectations. We invested US$2.5 million in a swimming and recreation<br />

club, another first for Lagos. This included the refurbishment of the existing<br />

Olympic-sized pool and the addition of water park slides, tennis courts, an<br />

outside exercise park, jogging track, miniature golf, a children’s play area, a<br />

food and beverage outlet and a merchandising stall. The club opened at the<br />

end of September 2010.<br />

The Federal Palace acquisition was completed on 26 May 2010 with the<br />

group now owning 49% of the company. Prior to this date, the 29%<br />

investment was held as an associate. The group has invested US$28 million<br />

in equity and advanced a loan of US$15 million to the company.<br />

Southern Africa<br />

A R145 million refurbishment of the Lesotho <strong>Sun</strong> commenced in March 2010<br />

and in July, work began on a R85 million refurbishment of the Kalahari<br />

Sands in Windhoek, Namibia.<br />

We continue to explore other opportunities in Africa and South America.<br />

SOUTH AFRICA<br />

Following the award of the casino licence for the Wild Coast <strong>Sun</strong>, an<br />

extensive R400 million refurbishment programme commenced in September<br />

2009. This included an upgrade of the casino, existing conference facilities,<br />

all hotel bedrooms, the reinstatement of 150 bedrooms from 50 Vacation<br />

Club units, the refurbishment of the buffet restaurant, lounge bar and Aloha<br />

Village restroom facilities, a new world-class water park, a new generator<br />

and a R1 million contribution towards improvements at the Cultural Village.<br />

The programme is scheduled for completion at the end of June 2012.<br />

We completed a R<strong>25</strong> million softs refurbishment of the Palace of the Lost<br />

City at <strong>Sun</strong> City in time for the World Cup.<br />

Construction of the new Windmill Privé area commenced in May 2010<br />

and should be completed by December 2010. The total capital<br />

expenditure on this project is estimated at R35 million and includes both<br />

smoking and non-smoking facilities, a lounge and separate entrance<br />

from a new private parking area.<br />

A R12 million conversion of staff units into additional hotel accommodation<br />

at the Carousel property was completed in June 2010 and a R1 million<br />

refurbishment of The Table Bay Hotel’s Pavilion Room was completed at<br />

the end of May.