2007 Interactive Registration Document - Renault
2007 Interactive Registration Document - Renault
2007 Interactive Registration Document - Renault
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
03 TABLE<br />
SUSTAINABLE DEVELOPMENT<br />
OF OBJECTIVES (EMPLOYEE RELATIONS, ENVIRONMENTAL AND SOCIAL)<br />
KEY ENVIRONMENTAL OBJECTIVES DATE OBJECTIVE SET DUE DATE<br />
WASTE REDUCTION AND RECYCLING<br />
Logistics For European plants: reduce packaging weight to 5 kg for new vehicles<br />
at the final assembly stage<br />
Logistics For plants outside Europe: establish quantified objectives for reducing<br />
packaging waste<br />
Manufacturing Reduce ordinary industrial waste (excluding metal offcuts) (2)<br />
to 37 kg per vehicle manufactured<br />
Manufacturing Reduce hazardous waste requiring treatment and elimination<br />
to 26 kg per vehicle manufactured<br />
SITUATION AT END-<strong>2007</strong><br />
(same scope as<br />
date objective set)<br />
2000 2009 Modus: 8 kg ; Clio III: 6.4 kg<br />
Twingo II: 8 kg<br />
Laguna III: 35 kg<br />
2004 2005 Underway<br />
2004 <strong>2007</strong> 46 kg/veh.<br />
2004 <strong>2007</strong> 29 kg/veh.<br />
Product Increase the proportion of recycled plastics in new vehicles to 50 kg 2004 2015 Scénic: 16 kg<br />
Modus: 18 kg<br />
Clio III: 12 kg<br />
Twingo II: 13 kg<br />
Laguna III: 35 kg<br />
End-of-life Achieve an effective recovery rate of 85% for materials from the vehicle<br />
recycling industry<br />
CONTINUOUS ENVIRONMENTAL MANAGEMENT<br />
Depends on country 2006 Follow-up<br />
by country available<br />
Audit all sites annually for risk prevention and environmental protection 2003 <strong>2007</strong> Completed<br />
Apply the principles of sustainable development to suppliers, through standards, training and assessments, etc. 2004 <strong>2007</strong> Completed<br />
Extend ISO 14001 certification to new sites<br />
• <strong>Renault</strong> Belgium<br />
2003 2005 Completed<br />
• Dacia<br />
2003 2005 Completed<br />
• Avtoframos<br />
2004 <strong>2007</strong> Underway<br />
Rollout of environmental training<br />
• Manufacturing Cap Éco 1<br />
2000 2005 Completed<br />
• Design Cap Éco 2<br />
2003 2006 Completed<br />
• Sales and marketing Cap Éco 3<br />
2004 <strong>2007</strong> Completed<br />
Establish the life-cycle inventory of new vehicles 2003 2005 Modus: Modus, Clio III,<br />
Twingo II, Laguna III<br />
Include the environment in all the standards making up the <strong>Renault</strong> Production Way (SPR) 2004 <strong>2007</strong> Underway<br />
Issue an environmental statement for each site 2002 <strong>2007</strong> 30 main sites<br />
Continue working with commercial partners to apply environmental management standards to the main<br />
impacts of vehicle servicing<br />
(2) All metal offcuts are recovered.<br />
< TABLE OF CONTENTS ><br />
2003 <strong>2007</strong> Completed<br />
122 <strong>Registration</strong> <strong>Document</strong> <strong>Renault</strong> <strong>2007</strong><br />
Find out more at www.renault.com<br />
01<br />
02<br />
03<br />
04<br />
05<br />
06<br />
07<br />
08