Thus, in-situ X-section concrete pile is formed. In order to improve the quality of pile, the pulling speed is<br />

0.6-1.5 m/min, the outside equivalent diameter of casing is between 0.4-2.0 m, and the pile length is between<br />

6-40 m.<br />

Figure 1 Physical diagram of XCC pile-driving equipment, pile mold, and flappable pile shoe<br />

FULL-SCALE MODEL TEST<br />

Model Trench<br />

Large-scale pile test model trench situated at Hohai <strong>University</strong>, China (shown in Figure 2). It is steel reinforced<br />

concrete structure. Model slot size is 4 m wide, 5 m long and 7 m high. With reaction frame and the above<br />

canopy height, total height is 12.3 m.<br />

Model Piles<br />

Figure 2 Full physical diagram of large-scale model test facility<br />

<strong>The</strong>re are three test model piles, including an XCC pile, a circular pile (numbered C 1 ) in the same cross-section<br />

area and a circular pile (numbered C 2 ) in the same perimeter. <strong>The</strong> specific parameters of test piles are shown in<br />

Table 2. Each test model pile concrete strength grade is C25 and its length is 5 m.<br />