08.02.2015 Views

Systematic process improvement using ISO 9001:2000 and CMMI

Systematic process improvement using ISO 9001:2000 and CMMI

Systematic process improvement using ISO 9001:2000 and CMMI

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

188 Transitioning from Legacy St<strong>and</strong>ards<br />

Table 6.11<br />

Comparison of Generic Practices <strong>and</strong> Enabling Process Areas<br />

Generic Goal/Practice<br />

Enabling Process Areas<br />

GG 1 Achieve Specific Goals The staged representation does<br />

not have GG 1.<br />

GP 1.1 Perform Base Practices The staged representation does<br />

not have GP 1.1.<br />

GG 2<br />

Institutionalize a Managed<br />

Process<br />

GP 2.1 Establish an Organizational Policy N/A<br />

GP 2.2 Plan the Process None; in some instances, this can<br />

be adequately covered in PP.<br />

OPD can be used in more mature<br />

organizations.<br />

GP 2.3 Provide Resources N/A<br />

GP 2.4 Assign Responsibility N/A; the PP <strong>process</strong> area can be<br />

used.<br />

GP 2.5 Train People None; in more mature<br />

organizations OT can be used.<br />

GP 2.6 Manage Configurations CM<br />

GP 2.7 Identify <strong>and</strong> Involve Relevant PP<br />

Stakeholders<br />

GP 2.8 Monitor <strong>and</strong> Control the Process PMC <strong>and</strong> MA<br />

GP 2.9 Objectively Evaluate Adherence PPQA<br />

GP 2.10 Review Status with Higher Level N/A<br />

Management<br />

GG 3<br />

Institutionalize a Defined Process<br />

GP 3.1 Establish a Defined Process OPD, IPM<br />

GP 3.2 Collect Improvement Information OPD<br />

GG 4<br />

Institutionalize a Quantitatively<br />

Managed Process<br />

GP 4.1 Establish Quantitative Objectives QPM<br />

for the Process<br />

GP 4.2 Stabilize Sub<strong>process</strong> Performance QPM<br />

GG 5<br />

Institutionalize an Optimizing<br />

Process<br />

GP 5.1 Ensure Continuous Process N/A<br />

Improvement<br />

GP 5.2 Correct Root Causes of Problems CAR<br />

• Provide resources.<br />

• Assign responsibilities for implementing the <strong>process</strong>.<br />

• Train the staff.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!