6.4 Transitioning from <strong>ISO</strong> <strong>9001</strong>:1994 to <strong>ISO</strong> <strong>9001</strong>:<strong>2000</strong> 203<br />
manuals. However, involving internal staff in the gap analysis has an advantage<br />
over hiring outside auditors, primarily due to the internal staff’s <strong>process</strong><br />
knowledge <strong>and</strong> interest in making necessary <strong>improvement</strong>s to those <strong>process</strong>es.<br />
Based on the gap analysis results, an organization should define <strong>process</strong>es<br />
that are comprised in its QMS [7]. This is by far the most difficult step.<br />
Procedures written to satisfy the <strong>ISO</strong> <strong>9001</strong>:1994 requirements may still be<br />
applicable but will require an in-depth review to make sure that they fit the<br />
newly defined <strong>process</strong>es <strong>and</strong> can be efficiently applied. The <strong>process</strong>es may<br />
already exist but they may not be visible, that is, documented <strong>and</strong> maintained.<br />
<strong>ISO</strong> does not provide any help in deciding which <strong>process</strong>es should<br />
be considered. The scope should include not only those <strong>process</strong>es needed<br />
for product realization, which in most cases will be fairly well defined, but<br />
also those that are needed to manage, monitor, measure, <strong>and</strong> improve the<br />
production <strong>process</strong>es.<br />
It is important that organizations determine the big picture first <strong>and</strong> then<br />
define their <strong>process</strong>es, <strong>process</strong> interactions <strong>and</strong> interfaces, resource needs,<br />
<strong>and</strong> measurements required to control the <strong>process</strong>es. Doing this <strong>process</strong><br />
definition top down <strong>and</strong> bottom up is probably the most efficient way,<br />
resulting in larger <strong>process</strong> ownership. Going top down may appear to be the<br />
most systematic way but it may take too long to determine all the <strong>process</strong>,<br />
particularly those that are already being practiced. Going bottom up may<br />
enhance <strong>process</strong> ownership but it may be difficult to abstract <strong>process</strong>es from<br />
all of the detail.<br />
In general, what the existing <strong>process</strong>es may lack are the measurement<br />
<strong>and</strong> control points that have to be determined for providing feedback needed<br />
for <strong>process</strong> management <strong>and</strong> control. Here again, the <strong>ISO</strong> requirements go<br />
beyond simple data collection <strong>and</strong> analysis. They imply a measurement<br />
<strong>process</strong> that interacts with the other <strong>process</strong>es, such as design, production,<br />
<strong>and</strong> purchasing.<br />
An organization has to determine how it will provide the resources necessary<br />
for production, management, <strong>and</strong> measurement. Decisions must be<br />
made to address low-level details, such as determining which measurements<br />
are necessary for controlling production <strong>and</strong> determining customer satisfaction<br />
<strong>and</strong> deciding how they will be collected. Addressing customer satisfaction<br />
may be another challenge even for those organizations that are already<br />
monitoring it. The <strong>ISO</strong> st<strong>and</strong>ard requires that organizations enhance customer<br />
satisfaction, which implies not only reacting to the customer complaints<br />
but also proactively searching for ways to improve.<br />
What is often neglected is the requirement for training the staff in the<br />
use of the new QMS. The <strong>process</strong>es embedded in the QMS will be quite