Systematic process improvement using ISO 9001:2000 and CMMI
Systematic process improvement using ISO 9001:2000 and CMMI
Systematic process improvement using ISO 9001:2000 and CMMI
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
266 Document Mapping<br />
Table 9.4<br />
<strong>ISO</strong> <strong>9001</strong>:<strong>2000</strong> Section 7 to <strong>CMMI</strong> ® Mapping<br />
<strong>ISO</strong> <strong>9001</strong>:<strong>2000</strong> PA <strong>CMMI</strong> ® Practices<br />
7 Product realization<br />
7.1 Planning product All GP 2.2, 3.1<br />
realization OPD SP 1.1, 1.2, 1.3<br />
IPM SP 1.1, 1.3, 1.4<br />
PP SP 1.1, 1.2, 1.3, 1.4,<br />
SP 2.1, 2.2, 2.3, 2.4, 2.5, 2.6,<br />
2.7<br />
QPM GP 2.3,<br />
SP 1.1, 1.2<br />
7.2 Customer-related<br />
<strong>process</strong>es<br />
7.2.1 Determination of RD SP 1.1, 1.2, SP 2.1, 2.2, 2.3,<br />
requirements related to SP 3.1, 3.2<br />
the product REQM SP 1.1<br />
TS SP 1.2<br />
7.2.2 Review of requirements RD GP 2.7, 2.10,<br />
related to the product SP 1.1, SP 2.1, SP 3.5<br />
VER GP 2.7, SP 2.2<br />
REQM GP 2.6, GP 2.7,<br />
SP 1.1, 1.2, 1.3, 1.5<br />
7.2.3 Customer communication RD GP 2.7<br />
REQM SP 1.2<br />
MA SP 2.4<br />
IPM SP 2.1, 2.2, 2.3<br />
7.3 Design <strong>and</strong> development<br />
7.3.1 Design <strong>and</strong> development PP All<br />
planning IPM SP 1.1, 1.3, 1.4, SP 2.1, 2.2,<br />
2.3,<br />
SP 3.1, 3.2, 4.1, 4.2, 4.3<br />
CM All<br />
RD GP 2.2, 2.8, 2.9<br />
REQM GP 2.2, 2.8, 2.9<br />
TS GP 2.2, 2.4, 2.7, 2.8, 2.9,<br />
SP 1.1, 1.2, 1.3, SP 2.1, 2.2,<br />
2.3, 2.4, SP 3.1, 3.2<br />
PI GP 2.2, 2.4, 2.7,<br />
SP 1.1, 1.2, 1.3, SP 2.1, 2.2<br />
VER GP 2.2, 2.4, 2.7, SP 1.1<br />
VAL GP 2.2, 2.4, 2.7, SP 1.1<br />
QPM SP 1.1, 1.2, 1.3<br />
7.3.2 Design <strong>and</strong> development RD GP 2.7, 2.10,<br />
inputs SP 1.1, 1.2, SP 2.1,<br />
SP 3.2, 3.3, 3.4, 3.5<br />
7.3.3 Design <strong>and</strong> development TS All<br />
outputs IPM SP 1.1<br />
7.3.4 Design <strong>and</strong> development PMC GP 2.7, SP 1.4, 1.6, 1.7<br />
review TS GP 2.8<br />
7.3.5 Design <strong>and</strong> development VER GP 2.6,<br />
verification SP 1.1, 1.2, 1.3, SP 2.1, 2.2, 2.3,<br />
SP 3.1, 3.2