7.4 Third phase: Establishing 217<br />
Table 7.4 Process Improvement Steps Based on <strong>ISO</strong>–<strong>CMMI</strong> ® Synergy<br />
(continued)<br />
Step <strong>ISO</strong> <strong>9001</strong>:<strong>2000</strong> <strong>CMMI</strong> ®<br />
7 Establish measurement Establish the MA <strong>process</strong> area. Specifically,<br />
<strong>and</strong> analysis function (8.1, establish SG 1.<br />
8.2.1, 8.2.3, 8.2.4, 8.4). May also need to establish QPM SG 2,<br />
Statistically Manage Sub<strong>process</strong> Performance,<br />
<strong>and</strong> CAR SG 1, Determine Causes of Defects.<br />
Need to address how the customer<br />
satisfaction will be obtained <strong>and</strong> used (<strong>ISO</strong><br />
8.2.1).<br />
8 Plan product realization Establish the PP <strong>process</strong> area (SG 3 may not<br />
(7.1). yet be required).<br />
Establish the SAM <strong>process</strong> area. Specifically,<br />
establish SP 1.1.<br />
Establish IPM <strong>process</strong> area (IPPD SG 3 <strong>and</strong> 4<br />
may not be required, <strong>and</strong> SG 2 is not<br />
needed until step 12).<br />
Implement GP 3.1, Establish a Defined Process,<br />
if not already implemented.<br />
Revisit OPD (which was already<br />
established).<br />
9 Perform product Implement RD, REQM, TS, <strong>and</strong> PI <strong>process</strong><br />
realization (5.2, 7.2.1,<br />
areas.<br />
7.2.2, 7.2.3, 7.3.1, 7.3.2, Ensure that customers are informed<br />
7.3.3). about product development, contractual<br />
matters, <strong>and</strong> their feedback is addressed<br />
(<strong>ISO</strong> 7.2.3).<br />
10 Perform verification <strong>and</strong> Invoke VER <strong>and</strong> VAL <strong>process</strong> areas.<br />
validation (7.3.5, 7.3.6, Specifically, VER SG 2 <strong>and</strong> 3 <strong>and</strong> VAL SG 2.<br />
7.5.2).<br />
11 Implement purchasing Invoke SAM <strong>process</strong> area. Specifically,<br />
(7.4). invoke SG 2; SG 1 may have to be<br />
periodically revisited.<br />
12 Perform measurement, Invoke PMC <strong>process</strong> area.<br />
tracking, reviewing, <strong>and</strong> Invoke PPQA specific practices.<br />
auditing (5.6, 7.3.4, 8.2.1, Invoke CM <strong>and</strong> MA SG 2.<br />
8.2.3, 8.5.2, 8.5.3). Implement CAR <strong>process</strong> area, as needed.<br />
Revisit OPF <strong>and</strong> IPM (which were already<br />
established).<br />
Perform GP 2.6, Manage Configurations; GP<br />
2.8, Monitor <strong>and</strong> Control the Process; GP 2.9,<br />
Objectively Evaluate Adherence; <strong>and</strong> GP 2.10,<br />
Review Status with Higher Level Management;<br />
in all relevant <strong>process</strong> areas.<br />
Perform GP 3.2, Collect Improvement<br />
Information, in all relevant <strong>process</strong> areas.<br />
Need <strong>ISO</strong> required procedures for the<br />
corrective <strong>and</strong> preventive actions (<strong>ISO</strong><br />
8.5.2 <strong>and</strong> 8.5.3).