08.02.2015 Views

Systematic process improvement using ISO 9001:2000 and CMMI

Systematic process improvement using ISO 9001:2000 and CMMI

Systematic process improvement using ISO 9001:2000 and CMMI

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

7.4 Third phase: Establishing 217<br />

Table 7.4 Process Improvement Steps Based on <strong>ISO</strong>–<strong>CMMI</strong> ® Synergy<br />

(continued)<br />

Step <strong>ISO</strong> <strong>9001</strong>:<strong>2000</strong> <strong>CMMI</strong> ®<br />

7 Establish measurement Establish the MA <strong>process</strong> area. Specifically,<br />

<strong>and</strong> analysis function (8.1, establish SG 1.<br />

8.2.1, 8.2.3, 8.2.4, 8.4). May also need to establish QPM SG 2,<br />

Statistically Manage Sub<strong>process</strong> Performance,<br />

<strong>and</strong> CAR SG 1, Determine Causes of Defects.<br />

Need to address how the customer<br />

satisfaction will be obtained <strong>and</strong> used (<strong>ISO</strong><br />

8.2.1).<br />

8 Plan product realization Establish the PP <strong>process</strong> area (SG 3 may not<br />

(7.1). yet be required).<br />

Establish the SAM <strong>process</strong> area. Specifically,<br />

establish SP 1.1.<br />

Establish IPM <strong>process</strong> area (IPPD SG 3 <strong>and</strong> 4<br />

may not be required, <strong>and</strong> SG 2 is not<br />

needed until step 12).<br />

Implement GP 3.1, Establish a Defined Process,<br />

if not already implemented.<br />

Revisit OPD (which was already<br />

established).<br />

9 Perform product Implement RD, REQM, TS, <strong>and</strong> PI <strong>process</strong><br />

realization (5.2, 7.2.1,<br />

areas.<br />

7.2.2, 7.2.3, 7.3.1, 7.3.2, Ensure that customers are informed<br />

7.3.3). about product development, contractual<br />

matters, <strong>and</strong> their feedback is addressed<br />

(<strong>ISO</strong> 7.2.3).<br />

10 Perform verification <strong>and</strong> Invoke VER <strong>and</strong> VAL <strong>process</strong> areas.<br />

validation (7.3.5, 7.3.6, Specifically, VER SG 2 <strong>and</strong> 3 <strong>and</strong> VAL SG 2.<br />

7.5.2).<br />

11 Implement purchasing Invoke SAM <strong>process</strong> area. Specifically,<br />

(7.4). invoke SG 2; SG 1 may have to be<br />

periodically revisited.<br />

12 Perform measurement, Invoke PMC <strong>process</strong> area.<br />

tracking, reviewing, <strong>and</strong> Invoke PPQA specific practices.<br />

auditing (5.6, 7.3.4, 8.2.1, Invoke CM <strong>and</strong> MA SG 2.<br />

8.2.3, 8.5.2, 8.5.3). Implement CAR <strong>process</strong> area, as needed.<br />

Revisit OPF <strong>and</strong> IPM (which were already<br />

established).<br />

Perform GP 2.6, Manage Configurations; GP<br />

2.8, Monitor <strong>and</strong> Control the Process; GP 2.9,<br />

Objectively Evaluate Adherence; <strong>and</strong> GP 2.10,<br />

Review Status with Higher Level Management;<br />

in all relevant <strong>process</strong> areas.<br />

Perform GP 3.2, Collect Improvement<br />

Information, in all relevant <strong>process</strong> areas.<br />

Need <strong>ISO</strong> required procedures for the<br />

corrective <strong>and</strong> preventive actions (<strong>ISO</strong><br />

8.5.2 <strong>and</strong> 8.5.3).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!