Systematic process improvement using ISO 9001:2000 and CMMI
Systematic process improvement using ISO 9001:2000 and CMMI
Systematic process improvement using ISO 9001:2000 and CMMI
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
7.4 Third phase: Establishing 227<br />
Table 7.5 Process Improvement Steps Based on <strong>ISO</strong>–<strong>CMMI</strong> ® Synergy for<br />
Organizations at CMM ® Maturity Level 2 (continued)<br />
Step <strong>ISO</strong> <strong>CMMI</strong> ®<br />
6 Establish quality Review implementation of the CMM ® SQA<br />
assurance (8.2.2).<br />
KPA for adequacy in <strong>CMMI</strong> ® terms. Revise<br />
if necessary to establish the PPQA PA.<br />
Establish VER <strong>and</strong> VAL PAs. Specifically,<br />
establish SG 1 in each PA.<br />
Revisit OPF, which was already<br />
implemented.<br />
Need <strong>ISO</strong> required procedures for<br />
responsibilities <strong>and</strong> requirements for<br />
planning <strong>and</strong> conducting audits <strong>and</strong><br />
<strong>process</strong> for selecting auditors (<strong>ISO</strong> 8.2.2).<br />
7 Establish measurement Establish the MA PA. Specifically, establish<br />
<strong>and</strong> analysis function (8.1, SG 1.<br />
8.2.1, 8.2.3, 8.2.4, 8.4). May also need to establish QPM SG 2,<br />
Statistically Manage Sub<strong>process</strong> Performance,<br />
<strong>and</strong> CAR SG 1, Determine Causes of Defects.<br />
Need to address how the customer<br />
satisfaction will be obtained <strong>and</strong> used (<strong>ISO</strong><br />
8.2.1).<br />
8 Plan product realization Review implementation of the CMM ® SPP<br />
(7.1). KPA for adequacy in <strong>CMMI</strong> ® terms. Revise<br />
as necessary to implement the PP PA <strong>and</strong><br />
the IPM PA.<br />
PP SG 3 may not be required. IPM (IPPD)<br />
SG 3 <strong>and</strong> 4 may not be required <strong>and</strong> SG 2 is<br />
not needed until step 10.<br />
Review assigned responsibilities (GP 2.4/AB<br />
4) for all level 2 PAs.<br />
Implement GP 2.4 (AB 4), Assign<br />
Responsibility, in all level 3 PAs <strong>and</strong> GP 2.7<br />
(DI 2), Identify <strong>and</strong> Involve Relevant<br />
Stakeholders, in all level 2 <strong>and</strong> 3 PAs.<br />
Implement GP 3.1 (AB 1), Establish a Defined<br />
Process, if not already implemented.<br />
Revisit OPD, which was already established.<br />
9 Perform product Implement RD, REQM, TS, <strong>and</strong> PI PAs.<br />
realization (5.2, 7.2.1,<br />
Ensure that customers are informed<br />
7.2.2, 7.2.3, 7.3.1, 7.3.2, about product development, contractual<br />
7.3.3). matters, <strong>and</strong> their feedback is addressed<br />
(<strong>ISO</strong> 7.2.3).<br />
10 Perform verification <strong>and</strong> Invoke VER <strong>and</strong> VAL PAs. Specifically,<br />
validation (7.3.5, 7.3.6, invoke VER SG 2 <strong>and</strong> 3, <strong>and</strong> VAL SG 2.<br />
7.5.2).<br />
11 Implement purchasing Review implementation of the CMM ® SSM<br />
(7.4). KPA <strong>and</strong> revise to make it compatible with<br />
the SAM PA. SG 1 may have to be<br />
periodically revisited.