08.02.2015 Views

Systematic process improvement using ISO 9001:2000 and CMMI

Systematic process improvement using ISO 9001:2000 and CMMI

Systematic process improvement using ISO 9001:2000 and CMMI

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

7.4 Third phase: Establishing 227<br />

Table 7.5 Process Improvement Steps Based on <strong>ISO</strong>–<strong>CMMI</strong> ® Synergy for<br />

Organizations at CMM ® Maturity Level 2 (continued)<br />

Step <strong>ISO</strong> <strong>CMMI</strong> ®<br />

6 Establish quality Review implementation of the CMM ® SQA<br />

assurance (8.2.2).<br />

KPA for adequacy in <strong>CMMI</strong> ® terms. Revise<br />

if necessary to establish the PPQA PA.<br />

Establish VER <strong>and</strong> VAL PAs. Specifically,<br />

establish SG 1 in each PA.<br />

Revisit OPF, which was already<br />

implemented.<br />

Need <strong>ISO</strong> required procedures for<br />

responsibilities <strong>and</strong> requirements for<br />

planning <strong>and</strong> conducting audits <strong>and</strong><br />

<strong>process</strong> for selecting auditors (<strong>ISO</strong> 8.2.2).<br />

7 Establish measurement Establish the MA PA. Specifically, establish<br />

<strong>and</strong> analysis function (8.1, SG 1.<br />

8.2.1, 8.2.3, 8.2.4, 8.4). May also need to establish QPM SG 2,<br />

Statistically Manage Sub<strong>process</strong> Performance,<br />

<strong>and</strong> CAR SG 1, Determine Causes of Defects.<br />

Need to address how the customer<br />

satisfaction will be obtained <strong>and</strong> used (<strong>ISO</strong><br />

8.2.1).<br />

8 Plan product realization Review implementation of the CMM ® SPP<br />

(7.1). KPA for adequacy in <strong>CMMI</strong> ® terms. Revise<br />

as necessary to implement the PP PA <strong>and</strong><br />

the IPM PA.<br />

PP SG 3 may not be required. IPM (IPPD)<br />

SG 3 <strong>and</strong> 4 may not be required <strong>and</strong> SG 2 is<br />

not needed until step 10.<br />

Review assigned responsibilities (GP 2.4/AB<br />

4) for all level 2 PAs.<br />

Implement GP 2.4 (AB 4), Assign<br />

Responsibility, in all level 3 PAs <strong>and</strong> GP 2.7<br />

(DI 2), Identify <strong>and</strong> Involve Relevant<br />

Stakeholders, in all level 2 <strong>and</strong> 3 PAs.<br />

Implement GP 3.1 (AB 1), Establish a Defined<br />

Process, if not already implemented.<br />

Revisit OPD, which was already established.<br />

9 Perform product Implement RD, REQM, TS, <strong>and</strong> PI PAs.<br />

realization (5.2, 7.2.1,<br />

Ensure that customers are informed<br />

7.2.2, 7.2.3, 7.3.1, 7.3.2, about product development, contractual<br />

7.3.3). matters, <strong>and</strong> their feedback is addressed<br />

(<strong>ISO</strong> 7.2.3).<br />

10 Perform verification <strong>and</strong> Invoke VER <strong>and</strong> VAL PAs. Specifically,<br />

validation (7.3.5, 7.3.6, invoke VER SG 2 <strong>and</strong> 3, <strong>and</strong> VAL SG 2.<br />

7.5.2).<br />

11 Implement purchasing Review implementation of the CMM ® SSM<br />

(7.4). KPA <strong>and</strong> revise to make it compatible with<br />

the SAM PA. SG 1 may have to be<br />

periodically revisited.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!