228 Approaches Using <strong>ISO</strong>–<strong>CMMI</strong> ® Synergy<br />

Table 7.5 Process Improvement Steps Based on <strong>ISO</strong>–<strong>CMMI</strong> ® Synergy for<br />

Organizations at CMM ® Maturity Level 2 (continued)<br />

Step <strong>ISO</strong> <strong>CMMI</strong> ®<br />

12 Perform measurement, Review implementation of the CMM ® SPTO<br />

tracking, reviewing, <strong>and</strong> KPA for adequacy in terms of the <strong>CMMI</strong> ® .<br />

auditing (5.6, 7.3.4, 8.2.1, Revise if necessary to implement PMC.<br />

8.2.3, 8.5.2, 8.5.3). Invoke PPQA specific practices.<br />

Invoke CM <strong>and</strong> MA SG 2.<br />

Implement CAR PA.<br />

Revisit OPF <strong>and</strong> IPM, which were already<br />

established.<br />

Perform GP 2.6 (DI 1), Manage<br />

Configurations; GP 2.8 (DI 3), Monitor <strong>and</strong><br />

Control the Process; GP 2.9 (VE 1), Objectively<br />

Evaluate Adherence; <strong>and</strong> GP 2.10 (VE 2),<br />

Review Status with Higher Level Management;<br />

in all relevant PAs.<br />

Perform GP 3.2 (DI 4), Collect Improvement<br />

Information, in all relevant PAs.<br />

Need <strong>ISO</strong> required procedures for the<br />

corrective <strong>and</strong> preventive actions (<strong>ISO</strong><br />

8.5.2, <strong>and</strong> 8.5.3).<br />

13 Other Need to address control of production<br />

<strong>and</strong> service provision (<strong>ISO</strong> 7.5.1).<br />

Need to address h<strong>and</strong>ling of customer<br />

property (<strong>ISO</strong> 7.5.4).<br />

Need to address preservation of the<br />

product during internal <strong>process</strong>ing (<strong>ISO</strong><br />

7.5.5).<br />

Need to address control of monitoring<br />

<strong>and</strong> measuring devices (<strong>ISO</strong> 7.6.1).<br />

Need procedure for h<strong>and</strong>ling of<br />

nonconforming products (<strong>ISO</strong> 8.3).<br />

implementing PAs at higher capability levels (Figure 7.4). Most benefits are<br />

reflected in the scope of <strong>process</strong> implementation <strong>and</strong> in institutionalization,<br />

stability, repeatability, <strong>and</strong> ease of <strong>improvement</strong>. At maturity or capability<br />

levels 3 <strong>and</strong> higher, the scope of implementation is organization wide instead<br />

of project specific, thus enabling economies of scale.<br />

Even for those organizations <strong>using</strong> the staged representation, implementing<br />

selected maturity level 3 PAs should not be a problem. Most <strong>process</strong><br />

<strong>improvement</strong> professionals <strong>using</strong> CMM ® v1.1 underst<strong>and</strong> that establishing<br />

a software EPG (which is part of the OPF KPA) or implementing the Peer<br />

Reviews KPA bring benefits to the organization.<br />

The steps for implementing <strong>process</strong> <strong>improvement</strong> based on <strong>ISO</strong>–<strong>CMMI</strong> ®<br />

synergy for organizations at CMM ® level 3 maturity are shown in Table 7.6.