APPENDIX A<br />

4. SAMPLING EQUIPMENT AND PROCEDURES<br />

4.1 General<br />

The samples collected during field investigation and restoration activities may include soil (surface and<br />

subsurface), sediment, groundwater, surface water, potable water, waste materials, leachate, and ambient<br />

air and effluents from treatment operations. Different types of sampling devices may be necessary to<br />

accomplish sampling activities. The selection of a device will be based on applicability, compatibility<br />

with analytical considerations, safety, representativeness, practicability, and economics. All equipment<br />

will be decontaminated between sampling locations according to Appendix B, SOP B1.10 of the BWP,<br />

unless the equipment used is dedicated for a particular sampling location.<br />

Section 4.2 provides an introduction to the Standard Operating Procedures (SOPs) for sampling various<br />

media. Section 4.3 provides guidance for collecting field QC samples. Procedures for decontamination<br />

of field equipment are provided in Section 4.4 and Appendix B of the BWP. Project-specific plans may<br />

append additional SOPs based on project requirements and site conditions. The Kirtland AFB SOPs<br />

were created from USACE, AFCEE, and EPA guidance sources.<br />

4.2 Sampling Procedures<br />

The SOPs for sampling various media are presented in Appendix B, Sections B1, B2, B4, and B6, and<br />

include the following procedures:<br />

General Procedures<br />

— SOP B1.1 Borehole and Sample Logging<br />

— SOP B1.2 Borehole Geophysical Logging<br />

— SOP B1.3 Monitoring Well Installation<br />

— SOP B1.4 Monitoring Well Development<br />

— SOP B1.5 Monitoring Well Abandonment<br />

— SOP B1.6 Temporary Well-Point of Hydro-Punch Type Sampling<br />

— SOP B1.7 Soil Gas Investigation<br />

— SOP B1.8 Surficial Geophysical Surveys<br />

— SOP B1.9 Land Surveys<br />

— SOP B1.10 Meteorological Monitoring<br />

— SOP B1.11 Equipment Decontamination<br />

Soil Sampling Procedures<br />

— SOP B2.1 Sediment Sampling<br />

Kirtland AFB<br />

Field Sampling Plan A-19 April 2004