<strong>BASE</strong>-WIDE PLAN<br />

2.2 Regulatory Coordination<br />

Regulatory coordination is the responsibility of Kirtland AFB. Copies of reports, plans, permit<br />

applications, design documents, and data summaries will be provided to both EPA and NMED by<br />

Kirtland AFB Environmental Restoration staff. Assigned individuals from Kirtland AFB will also<br />

coordinate meetings, site visits, and teleconference calls.<br />

2.3 Management Approach<br />

The management approach to completing investigations and corrective measures under the ERP involves<br />

the use of contractors for technical assistance and field implementation with federal government<br />

oversight. As discussed in section 2.1, Environmental Restoration personnel have access to contractors<br />

using funding mechanisms through government clients.<br />

2.3.1 Execution of Project-Specific Planning and Work Plan Development<br />

Project-specific work plans will be prepared as addenda to the volumes contained within the Base-Wide<br />

Plans. Only the sections that are pertinent to planned activities will be referenced within the projectspecific<br />

plans. Sections within the Base-Wide Plans that are not appropriate for planned activities will<br />

not be referenced within the project-specific plans. If a section within a project-specific plan references<br />

the Base-Wide Plan and contains a deviation from the Base-Wide Plans, the deviation will be identified<br />

and proper justification will be provided. The Base-Wide Plans may be amended to incorporate the<br />

deviation if it is determined to be significant and affects site operations throughout the base.<br />

Minimum elements of a project-specific work plan for investigations include the following (EPA, 1994):<br />

Purpose/Objectives<br />

Project Management<br />

Data Collection/Quality Assurance<br />

Data Management and Reporting<br />

Health and Safety Plan<br />

Public Involvement Plan<br />

Schedule for Facility Completion<br />

Waste Management and Minimization<br />

Minimum elements of a project-specific work plan for corrective action activities include the following (EPA,<br />

1994):<br />

Introduction/Purpose<br />

Project Management<br />

Project Schedule<br />

Corrective Action Quality Assurance/Quality Control Programs<br />

Kirtland Air Force Base<br />

Base-Wide Plans for the Environmental Restoration Program 4 April 2004