24.04.2015 Views

KIRTLAND AIR FORCE BASE ALBUQUERQUE, NEW MEXICO ...

KIRTLAND AIR FORCE BASE ALBUQUERQUE, NEW MEXICO ...

KIRTLAND AIR FORCE BASE ALBUQUERQUE, NEW MEXICO ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

APPENDIX D<br />

In addition, the following American Society for Testing and Materials (ASTM) standards should be<br />

considered for use on a project-specific basis as warranted by project-specific DQOs:<br />

4.4.2 Reporting<br />

ASTM D5924-96e1 – Standard Guide for Selection of Simulation Approaches in<br />

Geostatistical Site Investigations (1994)<br />

ASTM D5922-96e1 – Standard Guide for Analysis of Spatial Variation in Geostatistical Site<br />

Investigations (1996)<br />

ASTM D5923-96e1 – Standard Guide for Selection of Kriging Methods in Geostatistical Site<br />

Investigations (1996)<br />

Various reports may be generated during the course of environmental restoration activities, including<br />

interim, draft, and final reports. In addition, monthly progress reports and Informal Technical<br />

Information Reports (ITIRs) are also required. The ITIRs will be prepared as described in Section 4.0 of<br />

the IRP Handbook. The guidance given in the Handbook includes recommended table formats for<br />

reporting analytical results, extraction and analysis dates and holding times, QC data, and crossreferencing<br />

sample identification data.<br />

Formats for project deliverables should follow the Kirtland AFB document style guide (Reference). An<br />

electronic copy of all final reports should be transmitted to Kirtland AFB along with the required paper<br />

copies. All deliverables should also be maintained in the project files as required by the contract.<br />

As required, data will be organized, reported, and submitted according to the ERPIMS requirements<br />

contained in the ERPIMS Data Loading Handbook.<br />

The ASCII data files specified in the ERPIMS Data Loading Handbook will be submitted according to<br />

the current ERPIMS protocol. The ERPIMS data files will be submitted to the USACE or the U.S. Air<br />

Force Center for Environmental Excellence (AFCEE), as required by the contract, with subsequent<br />

delivery to AFCEE for management in the central data repository for USAF programs.<br />

A transmittal letter will accompany data file submittals stating contract number, delivery order, number,<br />

work authorization directive number. The transmittal letter will also identify which submittal group and<br />

file names are included. Data submitted in the ERPIMS data files will be in accordance with the<br />

appropriate valid value lists found in the appendix to the ERPIMS Data Loading Handbook.<br />

All data submitted will correspond exactly with the data contained in the original laboratory reports and<br />

other documents associated with sampling and laboratory tasks. All files delivered will be error free and<br />

in compliance with the ERPIMS Data Loading Handbook. Any errors identified by USACE or AFCEE-<br />

ESO in the submittals will be corrected.<br />

The current version of ERPTOOLS PC ERPIMS data files. The current version of ERPTOOLS PC<br />

contains validation checks to ensure that the data files conform to requirements in the ERPIMS Data<br />

Loading Handbook. The following is a list of the file names that may be submitted depending on the task<br />

order requirements, and a description for each:<br />

CON<br />

Contract Information<br />

Kirtland AFB<br />

Data Management Plan D-24 April 2004

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!