APPENDIX G<br />

1. INTRODUCTION TO CONSTRUCTION<br />

QUALITY ASSURANCE/QUALITY CONTROL PLAN<br />

This Base-Wide Construction Quality Assurance/Quality Control (QA/QC) plan has been prepared as part<br />

of the Kirtland Air Force Base (AFB) Base-Wide Plan (BWP) required to support environmental<br />

restoration activities at Kirtland AFB in Albuquerque, New Mexico. Environmental Restoration activities<br />

include Resource Conservation and Recovery Act (RCRA) interim corrective measures, voluntary<br />

corrective measures, and corrective measures implementation.<br />

This Plan combines the U.S. Army Corps of Engineers, Omaha District, Construction Quality Assurance<br />

Plan with the Air Force Center for Environmental Excellence Construction Quality Assurance and<br />

Quality Control system requirements to form a set of common requirements commensurate with the scope<br />

and nature of services planned for individual projects.<br />

The Construction QA/QC Plan shall be prepared in accordance with the requirements and guidelines<br />

established by the USAF in conjunction with contractor working for the USACE and AFCEE. Minimum<br />

components of the Plan shall include:<br />

Project Scope<br />

Responsibility and authority of project personnel.<br />

Construction quality assurance personnel qualifications<br />

Inspection activities<br />

Monitoring tests and observations<br />

Sampling requirements<br />

Any required submittals or documentation<br />

2. SUBMITTALS<br />

Required submittals may consist of the following types:<br />

Data—Submittals that provide calculations, descriptions, or documentation of the work.<br />

Drawing—Submittals that graphically show the relationship of various components of the work:<br />

schematic diagrams of systems and details of fabrication layouts of particular elements, connections, and<br />

other relational aspects of the work.<br />

Instruction—Preprinted material that describes the installation of a product, system, or material,<br />

including special notices and material safety data sheets concerning impedances, hazards and safety<br />

precautions.<br />

Schedule—Tabular lists showing the location, features, or other pertinent information regarding products,<br />

materials, equipment, or components to be used in the work.<br />

Kirtland AFB<br />

Construction Quality Assurance/Quality Control Plan G-5 April 2004