24.04.2015 Views

KIRTLAND AIR FORCE BASE ALBUQUERQUE, NEW MEXICO ...

KIRTLAND AIR FORCE BASE ALBUQUERQUE, NEW MEXICO ...

KIRTLAND AIR FORCE BASE ALBUQUERQUE, NEW MEXICO ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

APPENDIX C<br />

Problems encountered and corrective actions taken (including specifics regarding sampling<br />

problems and alternate sampling methods utilized.)<br />

Quality control activities<br />

Verbal or written instructions from government personnel<br />

Calibration procedures and recording<br />

Names of all personnel on-site (including their corporate, government, or other affiliations,<br />

their job titles, and their job functions and/or reasons for being on-site)<br />

Equipment used<br />

Health and Safety considerations (including site control measures, levels of personal<br />

protection required, on-site monitoring activities and results, accidents, etc.)<br />

Deviations from approved work plan<br />

General and specific remarks<br />

Expected activities for the next working day<br />

Distribution list for the DQCRs<br />

Signature and job title of the DQCRs preparer<br />

Drill logs completed as outlined in the General Geology Scope of Work or other appropriate<br />

guideline.<br />

15.1.2 Quality Control Summary Report (QCSR)<br />

The QCSR documents quality control practices and results implemented on a project-specific basis.<br />

Issues covered in this report will include a discussion of all data points which may have been influenced<br />

or compromised and their effect on achieving the Data Quality Objectives for the project. The QCSR will<br />

be summarized in all project-specific summary reports. An example of the elements required for this<br />

level of effort include:<br />

Project description<br />

Sampling and analysis scope<br />

Laboratory quality control activities<br />

Field quality control activities<br />

Data evaluation<br />

Analytical data results<br />

Kirtland AFB<br />

Quality Assurance Project Plan C-66 April 2004

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!