24.04.2015 Views

KIRTLAND AIR FORCE BASE ALBUQUERQUE, NEW MEXICO ...

KIRTLAND AIR FORCE BASE ALBUQUERQUE, NEW MEXICO ...

KIRTLAND AIR FORCE BASE ALBUQUERQUE, NEW MEXICO ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

APPENDIX C<br />

11.1.3 Nonconformance/Stop-Work<br />

Nonconformance/Stop-Work will be implemented as described in Section 14.0 of this plan.<br />

2.33 Laboratory Performance and System Audits<br />

11.1.4 Performance Audits<br />

Performance audits will be conducted by using performance evaluation samples and blind QC samples to<br />

assess the laboratory precision and accuracy of the total measurement system or portions thereof. The<br />

frequency of these audits will depend on the nature of the site being investigated and the end use of the<br />

analytical data.<br />

11.1.5 System Audits<br />

System audits will include examination of laboratory documentation on sample receiving, sample log-in,<br />

sample storage, C-O-C procedures, sample preparation and analysis, calibration and instrument operating<br />

records, personnel training and qualification, and nonconformance reporting and resolution.<br />

Any discrepancies identified during the audit will be resolved and corrected as discussed in Section 14.0<br />

of this plan.<br />

2.34 Audit Reports<br />

Field and laboratory audits will be documented in audit reports. Each audit report will identify the<br />

auditor and the activities audited at the site or in the laboratory. Individuals contacted and their<br />

functional roles will be identified in the report.<br />

The audit report will identify conformance and non-conformance with SOPs and technical requirements.<br />

If resolution to non-conformances is obtained during the audit, the audit report will identify the<br />

resolution. Other discrepancies will be addressed as discussed in Section 14.0 of this plan.<br />

Kirtland AFB<br />

Quality Assurance Project Plan C-52 April 2004

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!