24.04.2015 Views

KIRTLAND AIR FORCE BASE ALBUQUERQUE, NEW MEXICO ...

KIRTLAND AIR FORCE BASE ALBUQUERQUE, NEW MEXICO ...

KIRTLAND AIR FORCE BASE ALBUQUERQUE, NEW MEXICO ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

APPENDIX B<br />

SOP B6.4<br />

Concrete Sampling<br />

This SOP details the procedures required to collect concrete samples for chemical analysis:<br />

Wear appropriate PPE as required in the BWHSP (Appendix F of the BWP) and the SSHP.<br />

Each member of the sampling team should don new gloves at each sampling location.<br />

Place clean plastic sheeting on ground, concrete, or floor surface within sample area.<br />

Using a hand- or truck-mounted drill and a decontaminated coring bit, collect a core sample<br />

of the concrete. If possible, the diameter of the sample should be of sufficient size to satisfy<br />

the sample volume requirements. If water or air are used to provide cooling for the coring<br />

bit, then the water must be from an approved source, and proper precautions (filters, clean<br />

lines, etc.) must be taken to ensure that contaminants are not introduced into the air from an<br />

outside source.<br />

Transfer the core to the appropriate sample container.<br />

Cap the sampler container, place in double plastic bag, attach label, record all pertinent data<br />

in the field log book, and complete the C-O-C form.<br />

Samples collected for VOC analysis should not be crushed and ground in the field. It is permissible for<br />

all other analyses.<br />

Kirtland AFB<br />

SOPs for Field Investigations B-157 April 2004

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!