24.04.2015 Views

KIRTLAND AIR FORCE BASE ALBUQUERQUE, NEW MEXICO ...

KIRTLAND AIR FORCE BASE ALBUQUERQUE, NEW MEXICO ...

KIRTLAND AIR FORCE BASE ALBUQUERQUE, NEW MEXICO ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TABLES<br />

Installation ID Installation<br />

Type<br />

(Nature/Extent)<br />

KAFB-10633,<br />

B, C<br />

KAFB-10611B<br />

KAFB-10635,<br />

B, C<br />

Nature and<br />

vertical extent<br />

Horizontal and<br />

vertical extent of<br />

contaminants<br />

Nature and<br />

vertical extent of<br />

contaminants<br />

Co-<br />

Installations<br />

SVMW28<br />

SVMW27<br />

Groundwater<br />

Sampling<br />

(Depth)<br />

X<br />

X<br />

X<br />

Rationale Horizon Contingency<br />

vertical and horizontal<br />

gradient. Potentially as SVE<br />

point (25' screen, more screen<br />

in vadose zone - 10-15' in<br />

vadose zone, at least 10' in<br />

water, stainless). B and C<br />

horizon: 3" wells, 10' PVC<br />

screens, separate boreholes.<br />

Screens at WT and 40' and 80'.<br />

Assess product thickness and<br />

dissolved thickness. Assess<br />

vertical and horizontal<br />

gradient. Potentially as SVE<br />

point (25' screen, more screen<br />

in vadose zone - 10-15' in<br />

vadose zone, at least 10' in<br />

water). B and C horizons: 3"<br />

wells in same borehole. 10'<br />

PVC screens.<br />

Screen at 40'. Assess vertical<br />

distribution of dissolved<br />

plume. Assess horiz and<br />

vertical gradient. B horiz: 3"<br />

PVC well. 10'screen.<br />

Screens at WT and 40' and 80'.<br />

Assess product thickness and<br />

dissolved thickness. Assess<br />

vertical and horizontal<br />

gradient. Potentially as SVE<br />

point (25' screen, more screen<br />

in vadose zone - 10-15' in<br />

vadose zone, at least 10' in<br />

water). B and C horizons: 3"<br />

A, B, C<br />

B<br />

A,B,C<br />

groundwater at this<br />

location will be required.<br />

If the C-horizon exceeds<br />

any MCL, an assessment<br />

of the deeper<br />

groundwater at this<br />

location will be required.<br />

If the B-horizon exceeds<br />

any MCL, an assessment<br />

of the deeper<br />

groundwater at this<br />

location will be required.<br />

If the C-horizon exceeds<br />

any MCL, an assessment<br />

of the deeper<br />

groundwater at this<br />

location will be required.<br />

Kirtland AFB<br />

Groundwater Investigation Work Plan BFF Table 3-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!