APPENDIX H<br />

Permit Type Agency Contact KAFB Contact Comments Project Type<br />

Special Bulk Storage User Permit Elaine Rodriguez<br />

State of New Mexico Taxation and Revenue (505) 827-0725<br />

Department, Special Tax Programs and<br />

Services Section<br />

EPA Storm Water Construction NPDES<br />

General Permit<br />

NPDES Discharge Permit<br />

Bernalillo County Surface Disturbance<br />

Permit<br />

Brent Larsen (EPA)<br />

(214) 665-7523<br />

NMED - Water and Waste<br />

Management Division,<br />

Surface Water Quality<br />

Bureau<br />

(505) 827-0187<br />

Charles Aragon<br />

Albuquerque<br />

Environmental Health<br />

Department - Air Quality<br />

Division<br />

(505) 768-1951<br />

Liquid Waste Permit Larry Gutierrez NMED -<br />

Field Operations Division<br />

(505) 841-9450<br />

Holding Tank Permits<br />

Pat Montaño<br />

(505) 846-8577<br />

Pat Montaño<br />

(505) 846-8577<br />

Bob Flint / Matt Nida<br />

(505) 846-2808/853-3098<br />

Bob Flint / Matt Nida<br />

(505) 846-2808/853-3098<br />

Bob Flint / Matt Nida<br />

(505) 846-2808/853-3098<br />

For storage of bulk fuel onsite to be used only<br />

for non-highway vehicles/equipment<br />

Remediation/Construction<br />

For construction activities disturbing >1 acre. Remediation/Construction<br />

Will require preparation of a Storm Water<br />

Pollution Prevention Plan (SWPPP), filing a<br />

Notice of Intent (NOI) at least 48 hours prior to<br />

commencing construction, and filing a Notice<br />

of Termination (NOT) when the project is<br />

complete.<br />

For discharge of effluent to creek, stream,<br />

arroyo, or other surface water body<br />

For construction activities disturbing site > 3/4<br />

acre. Cost of the permit is $100 per acre.<br />

Permit must be applied for at least 10-days<br />

prior to construction.<br />

For in-ground septic tanks, new installations or<br />

modification(s) to existing systems.<br />

In lieu of installation of septic tank<br />

Remediation/Construction<br />

Remediation/Construction<br />

and Investigation<br />

Remediation/Construction<br />

Remediation/Construction<br />

Section 404 Permit from USACE Steve Purdy, PE (USACE) For wetlands impacts (dredging or filling) Remediation/Construction<br />

RCRA TSDF Part B Permit for treatment,<br />

storage or disposal of Hazardous Waste<br />

CEVR Project Manager For copy of existing permit. Remediation/Construction<br />

Kirtland AFB<br />

Base-Wide Permitting Plan H-7 April 2004