APPENDIX C<br />

Authorize the issuance of NCRs and recommend stop-work orders to the QA PM when<br />

necessary.<br />

Perform inspections, including periodic audits and surveillance, of field activities and assist<br />

the QA PM in performing his/her activities.<br />

Inspect and document the implementation of corrective action(s).<br />

Remain on the project site when directed by the QA PM.<br />

2.10 Site Health and Safety Specialist<br />

The SHSS will be present onsite as required during field operations and is responsible for all health and<br />

safety activities and the delegation of duties to the health and safety staff in the field. The SHSS ensures<br />

that all elements of the approved site health and safety plan are implemented and enforced onsite. Duties<br />

and responsibilities for the SHSS are detailed in Section 2.0 of the BWHSP (Appendix F of the BWP).<br />

2.11 Subcontractor Qualifications<br />

The minimum qualifications for project subcontractors are summarized in the following subsections.<br />

3.1.1 Analytical Laboratory<br />

The analytical laboratory’s qualifications will include current USACE analytical method certification,<br />

and or National Environmental Laboratory Accreditation Program (NELAP) accreditation. The<br />

analytical laboratory project manager will have ultimate responsibility for overall quality of work<br />

performed at the analytical laboratory, and is responsible for ensuring that work is performed according<br />

to the USACE Chemistry Scope of Services (SOS) and this QAPP.<br />

3.1.2 Geotechnical Laboratory<br />

Geotechnical laboratory testing will be performed as required on a project-specific basis, by a USACE<br />

approved laboratory. The laboratory project manager is responsible for ensuring that work is performed<br />

according to the USACE Chemistry SOS, the QAPP, and project requirements.<br />

3.1.3 Drilling Subcontractor<br />

Project-specific drilling requirements will be performed by a USACE approved drilling subcontractor,<br />

licensed in the State of New Mexico. The assigned representative will be responsible to ensure that work<br />

is completed in accordance with project-specific requirements and the USACE Geology SOS.<br />

3.1.4 Surveying Subcontractor<br />

Topographic and site surveying will be completed by a licensed surveyor registered in the state of New<br />

Mexico. The surveyor will be required to produce computer-generated maps that are based upon the<br />

New Mexico State Plane Coordinate System.<br />

Kirtland AFB<br />

Quality Assurance Project Plan C-18 April 2004