24.04.2015 Views

KIRTLAND AIR FORCE BASE ALBUQUERQUE, NEW MEXICO ...

KIRTLAND AIR FORCE BASE ALBUQUERQUE, NEW MEXICO ...

KIRTLAND AIR FORCE BASE ALBUQUERQUE, NEW MEXICO ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

APPENDIX H<br />

Spill Prevention Control and<br />

Countermeasure (SPCC) Plan<br />

Permit Type Agency Contact KAFB Contact Comments Project Type<br />

Air Emissions Permit (Source Registration,<br />

Permit-to-Construct, General Operating<br />

Permits)<br />

Industrial Waste Discharge Permit<br />

KAFB Dig Permit (AF Form 103)<br />

Albuquerque<br />

Environmental Health<br />

Department - Air Quality<br />

Division<br />

(505) 768-1930<br />

New Mexico One Call<br />

(505) 260-1990<br />

Pat Montaño<br />

(505) 846-8577<br />

Jackie Carns<br />

(505) 846-8781<br />

Pat Montaño<br />

(505) 846-8577<br />

Ray Perez (Chugach<br />

Management Services)<br />

(505) 846-9091<br />

For storage of fuel hydrocarbons in excess of<br />

1,320 gallons at one location. Will require<br />

preparation of an SPCC Plan.<br />

Remediation/Construction<br />

Source registration is required for remediation Remediation/Construction<br />

systems with air emissions (e.g. air strippers,<br />

SVE units, etc.) of more than 2,000 pounds per<br />

year of any air contaminant or emissions of any<br />

amount of a hazardous air pollutant. Authorityto-Construct<br />

permits have different emission<br />

threshold requirements depending on the<br />

constituents being emitted.<br />

For discharge of wastewater to POTW<br />

Covers Kirtland AFB utilities, pavements,<br />

environmental, etc. Required from Kirtland<br />

AFB Civil Engineering prior to<br />

commencement of excavation or grading<br />

activities. Allow 2 to 3 days for completion.<br />

Must also call New Mexico One call<br />

Remediation/Construction<br />

and Investigation<br />

Remediation/Construction<br />

and Investigation<br />

NEPA Permits / Cultural Resource Permits<br />

(AF Form 332)<br />

Valerie Butler<br />

(505) 846-8840<br />

Submit with Form 103 (Dig Permit)<br />

Remediation/Construction<br />

and Investigation<br />

Sandia National Laboratories Dig Permit<br />

Mike Jamael<br />

(505) 844-9390<br />

Troy Hart, Facilities<br />

Environmental Support<br />

(505) 845-0836<br />

Generally only required for certain areas of<br />

Kirtland AFB although it is recommended<br />

obtaining SNL clearance for all areas when<br />

boundaries are questionable.<br />

Remediation/Construction<br />

and Investigation<br />

Petroleum Storage Tank Permitting,<br />

installation or removal<br />

NMED Petroleum Storage<br />

Tank Bureau<br />

(505) 984-1741<br />

Pat Montaño<br />

(505) 846-8577<br />

For projects involving the installation or<br />

removal of petroleum storage tanks.<br />

Remediation/Construction<br />

and Investigation<br />

Discharge to Albuquerque Sanitary Sewers<br />

Bob Flint / Matt Nida<br />

(505) 846-2808/853-3098<br />

e.g. Discharge of monitoring well purge water<br />

to sanitary sewer<br />

Remediation/Construction<br />

and Investigation<br />

Kirtland AFB<br />

Base-Wide Permitting Plan H-8 April 2004

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!