- Page 1 and 2:
KIRTLAND AIR FORCE BASE ALBUQUERQUE
- Page 3 and 4:
DOCUMENT CERTIFICATION REPORT DOCUM
- Page 5 and 6:
DOCUMENT CERTIFICATION THIS PAGE IN
- Page 7 and 8:
CONTENTS 3.3.7 Groundwater and LNAP
- Page 9 and 10:
FIGURES FIGURES 2-1 Site Location M
- Page 11 and 12:
ACRONYMS AND ABBREVIATIONS ACRONYMS
- Page 13 and 14:
THIS PAGE INTENTIONALLY LEFT BLANK
- Page 15 and 16:
SECTION 1 1.1 Objectives and Scope
- Page 17 and 18:
SECTION 2 2.1 Site Description 2. B
- Page 19 and 20:
SECTION 2 • From roughly 86 ft bg
- Page 21 and 22:
SECTION 2 2.4.2 Investigative Resul
- Page 23 and 24:
SECTION 2 previous sampling results
- Page 25 and 26: SECTION 2 the soils. Only that part
- Page 27 and 28: SECTION 2 gpd. Investigating and re
- Page 29 and 30: SECTION 3 3.2 Quality Assurance/Qua
- Page 31 and 32: SECTION 3 being both an electrical
- Page 33 and 34: SECTION 3 3.3.4 Groundwater Monitor
- Page 35 and 36: SECTION 3 piezometers. Groundwater
- Page 37 and 38: SECTION 4 association meetings are
- Page 39 and 40: REFERENCES US Environmental Protect
- Page 41 and 42: TABLES Table 2-1. Hydrostratigraphi
- Page 43 and 44: TABLES Table 3-2 Proposed Installat
- Page 45 and 46: TABLES Installation ID Installation
- Page 47 and 48: TABLES Installation ID Installation
- Page 49 and 50: TABLES Installation ID Installation
- Page 51 and 52: Figures
- Page 53 and 54: SAN METEO SAN PEDRO 1540886 1541386
- Page 55 and 56: Source: CH2M HILL 2009 Figure 2-4
- Page 57 and 58: Source: CH2M HILL 2009 Figure 2-6
- Page 59 and 60: CONCEPTUAL SITE MODEL Figure 2-8 So
- Page 61 and 62: SAN METEO SAN PEDRO 1540672 1541172
- Page 63 and 64: Figure 3‐3 Typical Soil Vapor Mon
- Page 65 and 66: Appendix A NMED Guidance: NMED TPH
- Page 67 and 68: A TPH screening guideline was calcu
- Page 69 and 70: potential indoor air impacts from s
- Page 71 and 72: Appendix B Project Schedule
- Page 73 and 74: Appendix C Preliminary Report Outli
- Page 75: Appendix D Base-Wide Plans for Inve
- Page 79 and 80: BASE-WIDE PLAN APPENDICES Appendix
- Page 81 and 82: BASE-WIDE PLAN THIS PAGE INTENTIONA
- Page 83 and 84: BASE-WIDE PLAN THIS PAGE INTENTIONA
- Page 85 and 86: BASE-WIDE PLAN Kirtland AFB will pr
- Page 87 and 88: BASE-WIDE PLAN 2.2 Regulatory Coord
- Page 89 and 90: BASE-WIDE PLAN THIS PAGE INTENTIONA
- Page 91 and 92: BASE-WIDE PLAN composed of Precambr
- Page 93 and 94: BASE-WIDE PLAN THIS PAGE INTENTIONA
- Page 95 and 96: BASE-WIDE PLAN THIS PAGE INTENTIONA
- Page 97 and 98: BASE WIDE PLAN THIS PAGE INTENTIONA
- Page 99 and 100: BASE WIDE PLAN THIS PAGE INTENTIONA
- Page 101 and 102: BASE WIDE PLAN 3.1.4 Geochemical Tr
- Page 103 and 104: BASE WIDE PLAN THIS PAGE INTENTIONA
- Page 105 and 106: BASE WIDE PLAN THIS PAGE INTENTIONA
- Page 107 and 108: BASE WIDE PLAN THIS PAGE INTENTIONA
- Page 109 and 110: APPENDIX A THIS PAGE INTENTIONALLY
- Page 111 and 112: APPENDIX A CONTENTS (Concluded) Sec
- Page 113 and 114: APPENDIX A THIS PAGE INTENTIONALLY
- Page 115 and 116: APPENDIX A THIS PAGE INTENTIONALLY
- Page 117 and 118: APPENDIX A Section 1.0—Overview o
- Page 119 and 120: APPENDIX A THIS PAGE INTENTIONALLY
- Page 121 and 122: APPENDIX A Table 3-1. Activities As
- Page 123 and 124: APPENDIX A Determination of media t
- Page 125 and 126: APPENDIX A Specific Location Code:
- Page 127 and 128:
APPENDIX A — SOP B2.2 Surface Soi
- Page 129 and 130:
APPENDIX A The SOPs for measurement
- Page 131 and 132:
APPENDIX A THIS PAGE INTENTIONALLY
- Page 133 and 134:
APPENDIX A THIS PAGE INTENTIONALLY
- Page 135 and 136:
APPENDIX A Potential Problem Sick,
- Page 137 and 138:
APPENDIX A THIS PAGE INTENTIONALLY
- Page 139 and 140:
APPENDIX A THIS PAGE INTENTIONALLY
- Page 141 and 142:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 143 and 144:
APPENDIX B CONTENTS (Continued) Sec
- Page 145 and 146:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 147 and 148:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 149 and 150:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 151 and 152:
APPENDIX B ACRONYMS (Concluded) NaO
- Page 153 and 154:
APPENDIX B A general description of
- Page 155 and 156:
APPENDIX B that if gravel or rock f
- Page 157 and 158:
APPENDIX B Bedding Thickness Hardne
- Page 159 and 160:
APPENDIX B l greater than four inch
- Page 161 and 162:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 163 and 164:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 165 and 166:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 167 and 168:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 169 and 170:
APPENDIX B Redox potential or the o
- Page 171 and 172:
APPENDIX B collisions with hydrogen
- Page 173 and 174:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 175 and 176:
APPENDIX B If the boring is overdri
- Page 177 and 178:
APPENDIX B References for Other App
- Page 179 and 180:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 181 and 182:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 183 and 184:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 185 and 186:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 187 and 188:
APPENDIX B Length of screened inter
- Page 189 and 190:
APPENDIX B 3. If the well is a prod
- Page 191 and 192:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 193 and 194:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 195 and 196:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 197 and 198:
APPENDIX B Figure B1.5-1. Well Aban
- Page 199 and 200:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 201 and 202:
APPENDIX B Calibration The GC shoul
- Page 203 and 204:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 205 and 206:
APPENDIX B Ground Penetrating Radar
- Page 207 and 208:
APPENDIX B Frequency Domain Measure
- Page 209 and 210:
APPENDIX B Project name and locatio
- Page 211 and 212:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 213 and 214:
APPENDIX B Once installed, the mete
- Page 215 and 216:
APPENDIX B Decontamination of Sampl
- Page 217 and 218:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 219 and 220:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 221 and 222:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 223 and 224:
APPENDIX B Boreholes will be abando
- Page 225 and 226:
APPENDIX B Rock Core Sampling Soil
- Page 227 and 228:
APPENDIX B Thin Wall (Shelby Tube)
- Page 229 and 230:
APPENDIX B General Methodology The
- Page 231 and 232:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 233 and 234:
APPENDIX B A hand-sketched map of t
- Page 235 and 236:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 237 and 238:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 239 and 240:
APPENDIX B Standards—Chemical com
- Page 241 and 242:
APPENDIX B ― A knowledge of conta
- Page 243 and 244:
APPENDIX B Field Analysis with a Po
- Page 245 and 246:
APPENDIX B QA/QC Sample Minimum Fre
- Page 247 and 248:
APPENDIX B Water Sample Any deviati
- Page 249 and 250:
APPENDIX B Monitoring Well Purge Pr
- Page 251 and 252:
APPENDIX B atmospheric contact with
- Page 253 and 254:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 255 and 256:
APPENDIX B Figure B4.1-1. Well Purg
- Page 257 and 258:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 259 and 260:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 261 and 262:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 263 and 264:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 265 and 266:
APPENDIX B The sample used for pH m
- Page 267 and 268:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 269 and 270:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 271 and 272:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 273 and 274:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 275 and 276:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 277 and 278:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 279 and 280:
APPENDIX B A second method consists
- Page 281 and 282:
APPENDIX B As much information as p
- Page 283 and 284:
APPENDIX B shorter-term tests, 2- t
- Page 285 and 286:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 287 and 288:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 289 and 290:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 291 and 292:
APPENDIX B NOTE: Sampling of drums
- Page 293 and 294:
APPENDIX B Transfer the sample(s) d
- Page 295 and 296:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 297 and 298:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 299 and 300:
APPENDIX B Table B6.5-1 Air Quality
- Page 301 and 302:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 303 and 304:
APPENDIX B Table B7.1-1. Approved B
- Page 305 and 306:
APPENDIX B 1 2 3 4 5 COC EPA HWB Ki
- Page 307 and 308:
APPENDIX B 1 2 3 4 5 COC EPA HWB Ta
- Page 309 and 310:
APPENDIX B Table B7.1-3. Approved B
- Page 311 and 312:
APPENDIX B 1 2 3 4 5 COC EPA HWB Ki
- Page 313 and 314:
APPENDIX B THIS PAGE INTENTIONALLY
- Page 315 and 316:
APPENDIX B NMED, 2000. Technical Ba
- Page 317 and 318:
APPENDIX B Table B7.2-1. NMED Soil
- Page 319 and 320:
APPENDIX B Table B7.2-1 NMED Soil S
- Page 321 and 322:
APPENDIX B New Mexico Radiation Con
- Page 323 and 324:
APPENDIX B Conclusion 3.10.7.2. Pla
- Page 325 and 326:
APPENDIX C THIS PAGE INTENTIONALLY
- Page 327 and 328:
APPENDIX C CONTENTS (Continued) Sec
- Page 329 and 330:
APPENDIX C THIS PAGE INTENTIONALLY
- Page 331 and 332:
APPENDIX C THIS PAGE INTENTIONALLY
- Page 333 and 334:
APPENDIX C ACRONYMS (Concluded) QCS
- Page 335 and 336:
APPENDIX C Quality Systems Manual f
- Page 337 and 338:
APPENDIX C THIS PAGE INTENTIONALLY
- Page 339 and 340:
APPENDIX C Monitor task costs and s
- Page 341 and 342:
APPENDIX C Authorize the issuance o
- Page 343 and 344:
APPENDIX C analytical techniques an
- Page 345 and 346:
APPENDIX C 4.1.6 Comparability Comp
- Page 347 and 348:
APPENDIX C analyzed for every 20 or
- Page 349 and 350:
APPENDIX C THIS PAGE INTENTIONALLY
- Page 351 and 352:
APPENDIX C Table 5-1. Sample Requir
- Page 353 and 354:
APPENDIX C THIS PAGE INTENTIONALLY
- Page 355 and 356:
APPENDIX C Sample labels will be co
- Page 357 and 358:
APPENDIX C When sample analyses and
- Page 359 and 360:
APPENDIX C THIS PAGE INTENTIONALLY
- Page 361 and 362:
APPENDIX C Implement a system for i
- Page 363 and 364:
APPENDIX C THIS PAGE INTENTIONALLY
- Page 365 and 366:
APPENDIX C Environmental Measuremen
- Page 367 and 368:
APPENDIX C analyzed with each sampl
- Page 369 and 370:
APPENDIX C THIS PAGE INTENTIONALLY
- Page 371 and 372:
APPENDIX C Blanks (including method
- Page 373 and 374:
APPENDIX C Sample depth (as appropr
- Page 375 and 376:
APPENDIX C 11.1.3 Nonconformance/St
- Page 377 and 378:
APPENDIX C THIS PAGE INTENTIONALLY
- Page 379 and 380:
APPENDIX C 13.1.3 Completeness Asse
- Page 381 and 382:
APPENDIX C THIS PAGE INTENTIONALLY
- Page 383 and 384:
APPENDIX C A typical nonconformance
- Page 385 and 386:
APPENDIX C Figure 14-2. Typical Fie
- Page 387 and 388:
APPENDIX C Incompatible sample cont
- Page 389 and 390:
APPENDIX C Problems encountered and
- Page 391 and 392:
APPENDIX C THIS PAGE INTENTIONALLY
- Page 393 and 394:
APPENDIX C THIS PAGE INTENTIONALLY
- Page 395 and 396:
APPENDIX D THIS PAGE INTENTIONALLY
- Page 397 and 398:
APPENDIX D THIS PAGE INTENTIONALLY
- Page 399 and 400:
APPENDIX D THIS PAGE INTENTIONALLY
- Page 401 and 402:
APPENDIX D THIS PAGE INTENTIONALLY
- Page 403 and 404:
APPENDIX D Environmental data are o
- Page 405 and 406:
APPENDIX D THIS PAGE INTENTIONALLY
- Page 407 and 408:
APPENDIX D Table 3-1. Participants
- Page 409 and 410:
APPENDIX D THIS PAGE INTENTIONALLY
- Page 411 and 412:
APPENDIX D 4.1.1 Reporting Coordina
- Page 413 and 414:
APPENDIX D Upon completion of the f
- Page 415 and 416:
APPENDIX D 4.4 Data Evaluation The
- Page 417 and 418:
APPENDIX D In addition, the followi
- Page 419 and 420:
APPENDIX D THIS PAGE INTENTIONALLY
- Page 421 and 422:
APPENDIX D THIS PAGE INTENTIONALLY
- Page 423 and 424:
APPENDIX E THIS PAGE INTENTIONALLY
- Page 425 and 426:
APPENDIX E CONTENTS (Continued) Sec
- Page 427 and 428:
APPENDIX E THIS PAGE INTENTIONALLY
- Page 429 and 430:
APPENDIX E ACRONYMS (Concluded) WMP
- Page 431 and 432:
APPENDIX E Leave a site in no worse
- Page 433 and 434:
APPENDIX E The New Mexico Environme
- Page 435 and 436:
APPENDIX E THIS PAGE INTENTIONALLY
- Page 437 and 438:
APPENDIX E 2.1 Waste Characterizati
- Page 439 and 440:
APPENDIX E 2.3 Special Waste New Me
- Page 441 and 442:
APPENDIX E Documentation of all pro
- Page 443 and 444:
APPENDIX E Under no circumstances s
- Page 445 and 446:
APPENDIX E Soil determined to be a
- Page 447 and 448:
APPENDIX E THIS PAGE INTENTIONALLY
- Page 449 and 450:
APPENDIX E soil piles will be berme
- Page 451 and 452:
APPENDIX E Waste Types Used Oil (Mo
- Page 453 and 454:
APPENDIX E Table 4-1. Waste Managem
- Page 455 and 456:
APPENDIX E Steam-cleaning rinsate w
- Page 457 and 458:
APPENDIX E authorized personnel for
- Page 459 and 460:
APPENDIX E For waste streams determ
- Page 461 and 462:
APPENDIX E Containers will be inspe
- Page 463 and 464:
APPENDIX E 5.4.3 Storage PPE that i
- Page 465 and 466:
APPENDIX E Total weight or volume o
- Page 467 and 468:
APPENDIX E THIS PAGE INTENTIONALLY
- Page 469 and 470:
APPENDIX E THIS PAGE INTENTIONALLY
- Page 471 and 472:
APPENDIX F THIS PAGE INTENTIONALLY
- Page 473 and 474:
APPENDIX F CONTENTS (Continued) Sec
- Page 475 and 476:
APPENDIX F THIS PAGE INTENTIONALLY
- Page 477 and 478:
APPENDIX F ACRONYMS (Concluded) USA
- Page 479 and 480:
APPENDIX F THIS PAGE INTENTIONALLY
- Page 481 and 482:
APPENDIX F Ensure that work crews h
- Page 483 and 484:
APPENDIX F Assessing employee expos
- Page 485 and 486:
APPENDIX F THIS PAGE INTENTIONALLY
- Page 487 and 488:
APPENDIX F THIS PAGE INTENTIONALLY
- Page 489 and 490:
APPENDIX F by operations. All incom
- Page 491 and 492:
APPENDIX F Sunburn is not a conditi
- Page 493 and 494:
APPENDIX F slowly and quietly back
- Page 495 and 496:
APPENDIX F 4.5.4.2 Operator Qualifi
- Page 497 and 498:
APPENDIX F The isolation point shal
- Page 499 and 500:
APPENDIX F 4.5.9.2 Maintenance Prop
- Page 501 and 502:
APPENDIX F Do not drive the drill r
- Page 503 and 504:
APPENDIX F 4.5.9.7 Safe Use of Wire
- Page 505 and 506:
APPENDIX F Always use a clean, dry,
- Page 507 and 508:
APPENDIX F Special precautions for
- Page 509 and 510:
APPENDIX F Attempt to cross obstacl
- Page 511 and 512:
APPENDIX F 4.5.11 Excavation Safety
- Page 513 and 514:
APPENDIX F Trenches shall be reinsp
- Page 515 and 516:
APPENDIX F THIS PAGE INTENTIONALLY
- Page 517 and 518:
APPENDIX F THIS PAGE INTENTIONALLY
- Page 519 and 520:
APPENDIX F Rubber overboots or disp
- Page 521 and 522:
APPENDIX F THIS PAGE INTENTIONALLY
- Page 523 and 524:
APPENDIX F The SHSS will ensure tha
- Page 525 and 526:
APPENDIX F 8.2.1 Decontamination Pr
- Page 527 and 528:
APPENDIX F begin at the exit from t
- Page 529 and 530:
APPENDIX F THIS PAGE INTENTIONALLY
- Page 531 and 532:
APPENDIX F tape will be utilized, w
- Page 533 and 534:
APPENDIX F Fall Protection Safety h
- Page 535 and 536:
APPENDIX F Mobile Solid footing. Us
- Page 537 and 538:
APPENDIX F Keep loose tools off ste
- Page 539 and 540:
APPENDIX F Heavy Equipment 10.2.18
- Page 541 and 542:
APPENDIX F THIS PAGE INTENTIONALLY
- Page 543 and 544:
APPENDIX F Any recommended addition
- Page 545 and 546:
APPENDIX F For some emergency victi
- Page 547 and 548:
APPENDIX F In addition to training,
- Page 549 and 550:
APPENDIX F THIS PAGE INTENTIONALLY
- Page 551 and 552:
APPENDIX F and identify performance
- Page 553 and 554:
APPENDIX F THIS PAGE INTENTIONALLY
- Page 555 and 556:
APPENDIX F THIS PAGE INTENTIONALLY
- Page 557 and 558:
APPENDIX F THIS PAGE INTENTIONALLY
- Page 559 and 560:
APPENDIX G THIS PAGE INTENTIONALLY
- Page 561 and 562:
APPENDIX G THIS PAGE INTENTIONALLY
- Page 563 and 564:
APPENDIX G Statement—A required d
- Page 565 and 566:
APPENDIX H THIS PAGE INTENTIONALLY
- Page 567 and 568:
APPENDIX H THIS PAGE INTENTIONALLY
- Page 569 and 570:
APPENDIX H THIS PAGE INTENTIONALLY
- Page 571 and 572:
APPENDIX H Spill Prevention Control
- Page 573 and 574:
APPENDIX H THIS PAGE INTENTIONALLY
- Page 575 and 576:
APPENDIX I THIS PAGE INTENTIONALLY
- Page 577 and 578:
APPENDIX J THIS PAGE INTENTIONALLY
- Page 579:
APPENDIX J THIS PAGE INTENTIONALLY