17.11.2012 Views

Editor's Foreword

Editor's Foreword

Editor's Foreword

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 17 selected arms procurements and deliveries, nATO Europe<br />

Designation Type Quantity contract<br />

Value<br />

Greece (Grc)<br />

Katsonis-class<br />

Type 214<br />

Elli-class (S<br />

Type)<br />

Roussen/Super<br />

Vita<br />

Roussen/Super<br />

Vita<br />

Supplier<br />

country<br />

Prime<br />

contractor<br />

Order<br />

Date<br />

First<br />

Delivery<br />

Due<br />

notes<br />

non-naTO europe<br />

SSK 4 _ GER TMS/ HDW 2000 2005 Reportedly subject to contractual<br />

dispute<br />

FFG MLU 6 _ Dom Hellenic<br />

Shipyards<br />

PFM 5 €630m<br />

(US$800m)<br />

PFM 2 €299m<br />

(US$405m)<br />

F-16 Block 52+ FGA 30 US$1.99bn US Lockheed<br />

Martin<br />

AH-64A<br />

Apache<br />

Atk hel<br />

Upgrade<br />

201<br />

2005 2006 MLU to extend service life to 2020. 4<br />

vessels delivered by Jan 2009. Final<br />

vessel due 2010<br />

Dom Elefsis/ VT 2003 2007 First three delivered by October 2008.<br />

Deliveries ongoing<br />

Dom Elefsis/ VT 2008 2010 Further order to bring total to 7<br />

2005 2009 20 F-16C and 10 F-15D. Option on<br />

further 10. First 4 delivered May 2009.<br />

Final delivery due March 2011<br />

20 _ US _ 2008 2012 Upgrade to D standard to commence<br />

2010; 4 to have Longbow radar<br />

NH-90 TTH Hel 20 €657m NLD EADS 2002 2005 16 tac tpt variants and 4 Special<br />

Op variants. Option on further 14.<br />

Delivery status unclear<br />

hungary (hUn)<br />

Cougar MRAP 3 US$1.3m US Force<br />

Protection<br />

iceland (iSl)<br />

Thor PCO 1 €30m<br />

(US$39.6m)<br />

2009 _ Contract value incl spares and trg<br />

CHL ASMAR 2006 2009 For coast guard. To replace Odinn PCO<br />

italy (iTa)<br />

PzH 2000 How 70 _ GER OTO Melara/ 1999<br />

KMW<br />

2004 40 delivered. Final delivery 2010<br />

FREMM FFG 6 €1,628m Dom /FRA Orizzonte 2002 2010 Requirement of 10 Multi-Mission FFG.<br />

(US$2,361m)<br />

Sistemi<br />

Batch 1 ( 2 vessels) in production.<br />

Navali<br />

Batch 2 (4 vessels) had funding<br />

confirmed Mar 2008 - deliveries due<br />

2014 - 2017<br />

Todaro-class SS 2 €915m Dom Fincantieri 2008 2015 Second batch - option exercised from<br />

(Type 212A)<br />

(US$1.34 bn)<br />

1996 contract. With AIP<br />

Eurofighter FGA 121 _ Int'l Eurofighter 1985 2004 Tranche 1 ordered 1998 (29 ac).<br />

(Typhoon )<br />

GmbH<br />

Tranche 2 ordered 2004 (46 ac).<br />

Tranche 3 order (46 ac) due to be<br />

signed 2009<br />

KC-767 MRTT 4 _ US Boeing _ 2008 First delivery delayed.<br />

ATR-42MP MPA 1 _ Dom Alenia 2008 2010 For MSO<br />

ATR-72MP MPA 4 €360-400m Dom Alenia 2009 2012 To be fitted with long-range surv<br />

Aeronautica<br />

suite. Final delivery due 2014<br />

M-346 Master Trg ac 6 €220m Dom Alenia 2009 2010 Part of agreement for 15. First due due<br />

Aeronautica<br />

for delivery end-2010<br />

CH-47F Tpt Hel 16 €900m US Agusta 2009 2013 For army. Final delivery due 2017<br />

Chinook<br />

Westland<br />

NH-90 TTH Hel 116 _ NLD Agusta- 1987 2007 60 for army; 56 for navy. 5 delivered<br />

Westland<br />

to army. Remaining delivery status<br />

unclear<br />

europe<br />

(non-naTO)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!