17.11.2012 Views

Editor's Foreword

Editor's Foreword

Editor's Foreword

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

204 The MiliTary Balance 2010<br />

Table 17 selected arms procurements and deliveries, nATO Europe<br />

Designation Type Quantity contract<br />

Value<br />

Slovakia (SVK)<br />

C-27J Spartan Tpt ac 2 to 3 €120m<br />

(US$167m)<br />

Supplier<br />

country<br />

Prime<br />

contractor<br />

ITA Alenia<br />

Aeronautica<br />

Order<br />

Date<br />

First<br />

Delivery<br />

Due<br />

notes<br />

2008 _ Procurement suspended until 2011<br />

due to budget cuts<br />

Mi-17 Hel 4 _ Dom LOTN 2004 2008 Upgrade to SAR role. Final hel<br />

delivered 2009<br />

Slovenia (SVn)<br />

Patria 8x8 APC 135 SIT66.61bn<br />

(US$365.9m)<br />

FIN Patria 2007 2007 First veh accepted June 2009. Final<br />

delivery due 2013<br />

Spain (eSP)<br />

Paz satellite Sat 2 €160m Dom Hidesat/<br />

EADS CASA<br />

2008 2012 _<br />

National SAM 4 _ Dom/US Raytheon 2003 _ Four units each with 3D radar, ctrl<br />

Advanced<br />

unit and 2 six -round truck-mounted<br />

Surface-to-Air<br />

launchers. Successfully tested 2008.<br />

Missile System<br />

(NASAMS)<br />

In devt<br />

Leopard 2E MBT 239 €1.94bn Dom/GER General 1998 2003 ESP version of 2A6. Incl 16 ARV and 4<br />

(US$2.34bn)<br />

Dynamics<br />

SBS<br />

trg tk. Final deliveries due 2009<br />

Pizarro AIFV 212 €707m Dom General 2003 2005 In five variants. Final deliveries due<br />

(US$853m)<br />

Dynamics<br />

SBS<br />

2010<br />

RG-31 Mk 5E APC 100 €75m RSA GDSBS 2008 2009 85 in APC role, 10 ambulance and 5 CP<br />

(US$118m)<br />

versions. Delivery ongoing<br />

ARTHUR Radar _ €69m SWE SAAB 2006 2007 Contract incl 4 remote control units,<br />

Microwave<br />

trg sys and log spt. First delivery April<br />

2009<br />

SBT (V07) How 70 €181m Dom General 2005 – 4 155/52 APU SBT (V07) how, plus<br />

(US$216m)<br />

Dynamics<br />

design and production of 66 how<br />

(SIAC). Also retrofit of 12 APU SBT<br />

how from V06 to V07 version and 82<br />

towing vehicles<br />

Spike-LR ATGW See notes US$424.5m US General 2007 2007 260 launchers, 2,600 msl and spt svcs.<br />

Dynamics<br />

SBS<br />

Deliveries ongoing<br />

Alvaro de FFG 1 €71.5m Dom Navantia 2005 2012 Roger de Lauria. Option for one more<br />

Bazan F-100<br />

(US$105.4m)<br />

FFG. Weapons to incl MK 41 Baseline<br />

VII. F105 keel laid 20 Feb 2009,<br />

delivery due summer 2012<br />

Aegis BMS 1 US$117m US Lockheed<br />

Martin<br />

2007 2012 For Roger de Lauria F-100<br />

Buques PCO 4 €1.1 bn Dom Navantia 2005 2009 To be named Meteoro, Rayo,<br />

de Accion<br />

(US$1.4bn)<br />

Relámpago and Tornado. Deliveries<br />

Maritima<br />

delayed by over 1 year. First keel layed<br />

(BAM)<br />

March 2009. First delivery scheduled<br />

end 2010. Addl vessels ordered 2009<br />

Strategic LHD 1 _ Dom Navantia 2003 2010 Juan Carlos I. Capacity 6 NH90 or 4<br />

Projection<br />

CH-47. Delivery scheduled for early<br />

Ship<br />

2010<br />

S-80A SSK with 4 _ Dom Navantia 2003 2013 First vessel, S-81, due for delivery Dec<br />

AIP<br />

2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!