17.11.2012 Views

Editor's Foreword

Editor's Foreword

Editor's Foreword

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 17 selected arms procurements and deliveries, nATO Europe<br />

Designation Type Quantity contract<br />

Value<br />

Eurofighter<br />

(Typhoon)<br />

AV-8B Harrier II FGA<br />

upgrade<br />

Supplier<br />

country<br />

Prime<br />

contractor<br />

FGA 87 _ Int'l Eurofighter<br />

GmbH<br />

4 €11.5m<br />

(US$17.8m)<br />

Order<br />

Date<br />

First<br />

Delivery<br />

Due<br />

notes<br />

non-naTO europe<br />

1994 2004 Tranche 2 ordered 2004 (33 ac).<br />

Tranche 3 order (34 ac) due to be<br />

signed 2009<br />

Dom EADS 2008 2011 Upgrade: To AV-8B Harrier II Plus<br />

standard<br />

A-400M Tpt ac 27 See notes Int'l Airbus 2003 2010 In development. Official unit cost<br />

US$80m. First deliveries delayed<br />

CN-235 S300 MPA ac 2 _ Int'l EADS CASA 2007 2008 For Guardia Civil maritime patrol<br />

duties<br />

AS 532AL<br />

Cougar<br />

Hel 5 €116m<br />

(US$171m)<br />

NH-90 TTH Hel 45 _ Int'l NH<br />

Industries<br />

AS-665 Tiger<br />

(HAD)<br />

Turkey (TUr)<br />

Gokturk (recce<br />

& surv sat)<br />

Int'l Eurocopter 2008 _ 3 for army air wing. 2 for Emergencies<br />

Military Unit<br />

2007 2010 _<br />

Hel 24 €1.4bn FRA Eurocopter 2003 2007 First 3 hel delivered May 2007, second<br />

3 by 2008. Final delivery due 2011<br />

Sat 1 € 270m<br />

(US$380m)<br />

ITA Telespazio 2009 _ Thales Alenia Space responsible for<br />

Sat. Dom companies involved in<br />

design and development stage &<br />

supply of subsystems<br />

M60 A1/ Sabra MBT 170 US$688m ISR IMI 2002 2006 Final deliveries due 2010<br />

Mk III<br />

Upgrade<br />

Altay MBT 250 See notes Dom/ROK Otokar 2007 _ 4 initial prototypes by 2014 for approx<br />

US$500m. To be followed by an order<br />

for 250 units following testing<br />

Firtina How _ _ ROK/ Dom Samsung 2001 2003 ROK Techwin K9 Thunder. Total<br />

155mm/52-cal<br />

requirement of 300. Deliveries<br />

ongoing<br />

U-214 SSK 6 US$3.5bn GER HDW, TKMS<br />

and MFI<br />

2009 2015 To be built at Golcuk shipyard<br />

Ada-class FSG 8 _ Dom Istanbul<br />

Naval<br />

Shipyard<br />

Coast Guard<br />

SAR project<br />

205<br />

1996 2011 First of class, TCG Heybeliada launched<br />

2008, ISD 2011. Part of Milgem project<br />

which incl requirement for 4 F-100<br />

class FFG<br />

PC/SAR 4 €352.5m Dom RMK Marine 2007 2011 Based on Sirio-class PCO design. For<br />

Coast Guard. Final delivery due 2011<br />

56m PB PB 16 €402m<br />

(US$545m)<br />

F-16C/D Block<br />

50<br />

F-16C/D FGA<br />

Upgrade<br />

FGA 30 US$1.78bn US/Dom Lockheed<br />

Martin<br />

216 US$635m US Lockheed<br />

Martin/ TAI<br />

Dom Dearsan 2007 2010 Final delivery due 2015<br />

2009 2011 14 F-16C and 16 F-16D variants. Final<br />

assembly in TUR. Final delivery due<br />

2014<br />

2006 _ Upgrade. 216 modernisation kits,<br />

flight testing, training, technical spt<br />

and sustainment activities<br />

A-400M Tpt ac 10 See notes Int'l Airbus 2003 2012 In development. Official unit cost<br />

US$80m. First deliveries delayed<br />

B-737 AEW&C 4 US$1bn US Boeing 2002 2009 Peace Eagle programme. Option for<br />

further 2. Delivery delayed<br />

ATR-72 MPA 10 US$210m ITA Alenia<br />

Aeronautica<br />

KT-1 Woong-<br />

Bee<br />

Trg ac 40 US$500m Dom /<br />

ROK<br />

2005 2010 First five deliveries by 2010. Final<br />

delivery due 2012<br />

KAI / TAI 2007 2009 To replace T-37 trg ac. Option for 15<br />

further ac<br />

S-70B Seahawk Hel 17 _ US Sikorsky 2006 2009 Delivery status unclear<br />

europe<br />

(non-naTO)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!