East Asia and Australasia<br />

Table 35 Selected arms procurements and deliveries, East Asia and Australasia<br />

Designation Type Quantity Contract<br />

Value<br />

Japan (JPN)<br />

Theatre<br />

Missile<br />

Defence<br />

System<br />

Supplier<br />

Country<br />

Prime<br />

Contractor<br />

Order<br />

Date<br />

First<br />

Delivery<br />

Due<br />

Notes<br />

BMD – _ Dom/US _ 1997 – Joint development with US from<br />

1998. Programme ongoing and incl<br />

SM-3 and PAC-3 systems<br />

Hyuga-class DDGH 2 Y200bn Dom IHI Marine<br />

United<br />

19DD DDGH 4 Y84.8 bn<br />

(US$700m)<br />

Standard<br />

Missile 3<br />

(SM-3)<br />

Hirashimaclass<br />

Dom Mitsubishi<br />

Heavy<br />

Industries<br />

2001 2008 2nd vessel due for commissioning<br />

2011<br />

437<br />

2007 2011 To replace the oldest 5 Hatsuyukiclass.<br />

First 19DD laid down July 2009.<br />

Commissioning due 2011<br />

SAM 9 US$458m US Raytheon 2006 _ Part of Aegis BMD System for Kongouclass<br />

DDGH<br />

MCMV 3 _ Dom Universal SB 2004 2009 Fourth vessel expected. Final delivery<br />

(JS Takashima) due March 2010<br />

Souryu-class SSK 4 _ Dom Kawasaki/<br />

Mitsubishi<br />

2004 2009 Second batch may be ordered. 2nd<br />

vessel (Unryu) due to commission<br />

March 2010<br />

KC-767J Tpt/tkr 4 _ US Boeing 2003 2008 Final ac delivered in 2009<br />

AH-64D<br />

Apache<br />

EH-101 Merlin<br />

(MCH101)<br />

Korea, Republic of (ROK)<br />

(Multifunction<br />

Surface to<br />

Air Missile)<br />

M-SAM<br />

Hel 13 _ Dom Boeing 2001 2006 Up to 6 in Longbow con�g. 10<br />

delivered by early 2008. Deliveries<br />

ongoing<br />

Hel 14 _ UK Agusta- 2003 2006 For JMSDF to replace MH-53E and<br />

Westland/ KHI<br />

S-61 hel under MCH-X programme.<br />

Deliveries ongoing<br />

SAM – _ Dom _ 1998 2009 In development. To replace current<br />

army Hawk SAMs. Due to enter service<br />

by 2010<br />

XK2 MBT 600 KWR3.9trn<br />

(US$2.6bn)<br />

K-21 NIFV IFV 500 (est) US$3.5 m<br />

per unit<br />

Sejong<br />

Daewangclass<br />

KDX-3<br />

Ulsan - 1 class<br />

FFX<br />

Unknown<br />

Class<br />

Haeseong<br />

(Sea Star<br />

- ASM/SSM-<br />

700K)<br />

KSS-II (Type<br />

214)<br />

Dom Hyundai<br />

Rotem<br />

Dom Doosan<br />

Infracore<br />

2007 _ _<br />

2008 2009 Delivery status unclear<br />

DDGH 3 _ Dom DSME 2002 2008 3 additional vessels may be ordered.<br />

First vessel (Sejong Daewang)<br />

commissioned Dec 2008. Final<br />

delivery 2012<br />

FFGH 6 KRW1.7bn<br />

(US$1.8bn)<br />

PCO 5 KRW150bn<br />

(US$120m)<br />

ASCM 100 KRW270m<br />

(US$294m)<br />

SSK 3 KRW1.27tn<br />

(US$1.4bn)<br />

Dom Hyundai<br />

Heavy<br />

Industries<br />

Dom Hyandai<br />

Heavy<br />

Industries<br />

Dom _ 2006 2010 _<br />

GER/Dom Hyundai<br />

Heavy<br />

Industries<br />

2006 2015 To replace current lsan-class FFG. ISD<br />

by 2015. Up to 15 vessels may be<br />

built<br />

2009 _ For Coast Guard. Due to be completed<br />

by 2012<br />

2000 2007 Third vessel (An Jung-geun) due to be<br />

commissioned November 2009<br />

East Asia and<br />

Australasia