17.11.2012 Views

Editor's Foreword

Editor's Foreword

Editor's Foreword

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 18 selected arms procurements and deliveries, non-nATO Europe<br />

Designation Type Quantity contract<br />

Value<br />

Armoured APC 113 €240m<br />

Modular<br />

Vehicle (AMV)<br />

(US$338m)<br />

AMOS 120mm Mor 2 SKR30m<br />

(approx<br />

US$4m)<br />

Koster MCV<br />

MLU<br />

Supplier<br />

country<br />

Prime<br />

contractor<br />

Order<br />

Date<br />

First<br />

Delivery<br />

Due<br />

notes<br />

non-naTO europe<br />

FIN Patria 2009 2011 Further 113 req. Was subject to<br />

contractual dispute<br />

Int’l _ 2006 2011 Two prototypes to be mounted on Vv90<br />

tracked chassis<br />

5 US$133m Dom Kockums 2007 2009 MLU. HMS Koster and Vinga recommissioned<br />

Mar 2009, Ulvön, Kullen<br />

and Ven ISD due 2010<br />

Visby FSGH 5 _ Dom Kockums 1995 2005 First vessel ltd op role 2008; add’l vessels<br />

ISD expected by 2010<br />

CB 90H LCA<br />

Upgrade<br />

145 _ Dom _ 2008 _ Upgrade from 90H to 90HS<br />

JAS 39A/B<br />

Gripen<br />

FGA 31 SEK3.9bn<br />

Upgrade<br />

(US$611m)<br />

Dom SAAB 2007 2012 Upgrade: 18 to become JAS 39Cs and 13<br />

to become JAS 39D two-seaters<br />

NH-90 Hel 18 _ Int’l Eurocopter 2001 2007 13 TTT/SAR hel and 5 ASW variants.<br />

Option for 7 further hel. Deliveries<br />

ongoing<br />

Switzerland (che)<br />

Piranha I APC 160 _ Dom Mowag 2006 2008 Re-role of Piranha I tank hunter APC to<br />

protected comd vehicles. Final delivery<br />

due 2010<br />

Piranha IIIC NBC<br />

Recce<br />

DURO IIIP APC/NBC<br />

lab<br />

12 See notes Dom Mowag 2008 2010 CHF260m (€167m) incl 232 DURO IIIP.<br />

Final delivery due 2012<br />

232 See notes Dom Mowag 2008 2010 CHF260m (€167m) incl 12 Piranha IIIC.<br />

220 personnel veh and 12 NBC labs. Final<br />

delivery due 2012<br />

EC135 Hel 2 _ Int’l EADS 2006 2008 Final delivery due 2010<br />

EC635 Tpt/trg<br />

hel<br />

18 _ Int’l EADS 2006 2008 3 delivered by Aug 2008. Final delivery<br />

due 2010<br />

Ukraine (UKr)<br />

An-70 Tpt ac 5 _ RF Antonov 1991 2008 Limited serial production started. First<br />

delivery due 2010<br />

209<br />

europe<br />

(non-naTO)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!