17.11.2012 Views

Editor's Foreword

Editor's Foreword

Editor's Foreword

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

374 The MiliTAry BAlAnCe 2010<br />

Table 32 Selected arms procurements and deliveries, South and Central Asia<br />

Designation Type Quantity Contract<br />

Value<br />

Supplier<br />

Country<br />

Prime<br />

Contractor<br />

Order<br />

Date<br />

First<br />

Delivery<br />

Due<br />

Afghanistan (AFG)<br />

G222 Tac tpt ac 18 US$257m ITA Alenia 2008 2009 ITA stock ordered by US.<br />

Aero-<br />

Refurbished and modernised by<br />

nautica<br />

Alenia Aeronautica. First delivered<br />

July 2009<br />

Mi-24 Hel 6 CZE 2007 2008 Ex-CZE stock. Modernised at NATO<br />

expense. Delivery status unclear<br />

india (inD)<br />

Prithvi II SRBM 54 INR12.13bn Dom Bharat<br />

Dynamics<br />

2006 _ For air force<br />

Sagarika K-15 SLBM _ _ Dom Bharat 1991 _ In development. First test reported<br />

Dynamics<br />

successful; est 700km range with 1<br />

ton payload<br />

Nirbhay Cruise msl _ _ Dom DRDO _ _ In development. First flight test due<br />

2009. Designed for air, land and sea<br />

platforms. Est 1,000km range. First<br />

tests due late 2009<br />

Agni III IRBM _ _ Dom DRDO _ 2010 In development. Designed to carry<br />

200-250 KT warhead with a range of<br />

3,000km.<br />

Agni IV IRBM – _ Dom DRDO _ 2012 In development. Est 5,000km range<br />

Arjun MBT 124 See notes Dom ICVRDE 2000 2009 Development costs per vehicle est<br />

INR3bn. Low-rate production began<br />

2004. Deliveries ongoing<br />

T-90S Bhishma MBT 347 US$1.23bn Dom/RUS Avadi<br />

Heavy<br />

Vehicles<br />

2007 _ First ten delivered June 2009<br />

BrahMos Block II<br />

(Land Attack)<br />

Medium -range<br />

SAM<br />

Advanced<br />

Technology<br />

Vessel (ATV)<br />

Akula-class<br />

(Type 971)<br />

Cruise msl 10 lnchr INR83.52bn<br />

(US$1.64bn)<br />

RUS/Dom Brahmos<br />

Aerospace<br />

notes<br />

2006 2009 10 lnchr entered test regime; 2<br />

accepted March 2009<br />

SAM/AD 18 units US$1.4bn ISR IAI 2009 2016 For air-force. Development and<br />

procurement contract for a medium<br />

range version of the Barak longrange<br />

naval AD system<br />

SSBN 5 _ Dom DRDO _ _ SLBM devt programme. INS Arihant<br />

launched July 2009; 2 yr of sea trials<br />

expected<br />

SSN 1 approx<br />

US$700m<br />

RUS Rosoboronexport<br />

2004 2009 10 year lease from RUS. Nerpa in RUS<br />

service, to be renamed INS Chakra.<br />

Delivery expected end-2009<br />

Scorpene SSK 6 US$3.5bn FRA/Dom DCNS 2005 2012 First delivery had been due 2012,<br />

with one per year thereafter, reports<br />

now suggest a delay of one year.<br />

Option for a further 6 SSK. Delivery<br />

delayed<br />

Sindhughosh-<br />

class<br />

3M14E Klub-S<br />

(SS-N-27 Sizzler)<br />

Kiev-class<br />

Admiral<br />

Gorshkov<br />

Project 71/<br />

Indigenous<br />

Aircraft Carrier<br />

SSK<br />

Upgrade<br />

10 _ RUS ORDTB/<br />

Rosoboronexport<br />

SLCM 28 INR8.44bn<br />

(US$182m)<br />

CV 1 US$2.7-3bn RUS Rosoboronexport<br />

CV 1 US$730m Dom Cochin<br />

Shipyard<br />

2002 – Upgrade incl mod to accept Klub-S<br />

3M-14E msl. Delayed due to<br />

problems with msl system<br />

RUS Novator 2006 _ For a number of Sindhughosh- class<br />

SSK. Delivery status unclear<br />

1999 2008 Incl 16 MiG 29 K. To be renamed<br />

INS Vikramaditya. Expected to be<br />

commissioned 2012<br />

2001 2012 To be named Vikant. Formerly<br />

known as Air Defence Ship (ADS).<br />

Second vessel of class anticipated

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!