10.08.2012 Views

ONE ROOF

ONE ROOF

ONE ROOF

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

stones of this consulting service involves inspecting<br />

and evaluating existing airports for potential energy<br />

savings and making suggestions for improvement.<br />

Moreover, the company also prepares environmental<br />

impact studies and develops waste management<br />

concepts for airports.<br />

HOCHTIEF sponsors winning team<br />

The team of students from Darmstadt Technical University<br />

we sponsored won the US Department of Energy’s<br />

2009 Solar Decathlon. For the German institution, it<br />

was the second win in a row at the US competition,<br />

where participants must build a self-sufficient, marketable<br />

building. The “surPLUShome” met the strict requirements<br />

by including, among other things, highly insulated<br />

exterior walls covered in photovoltaic cells. In<br />

the summer months, the heat is reduced by a cooling<br />

ceiling. We provided the successful team with technical,<br />

logistic and financial support, and the resulting innovative<br />

ideas will benefit our residential construction segment.<br />

Sustainability seal awarded<br />

The German Sustainable Building Council, an organization<br />

of which we are a founding member, began<br />

awarding German Certification for Sustainable Buildings<br />

in January 2009. We reviewed the efficacy in<br />

practice of such certification criteria as environmental,<br />

economic, socio-cultural and functional quality in an<br />

in-house innovation project, thereby actively participating<br />

in the development of the certification. In the subsequent<br />

pilot phase, our “smarthouse” office complex<br />

in Munich was one of the first projects to receive the<br />

gold preliminary certification from the German Sustainable<br />

Building Council. At the same time, we added to<br />

HOCHTIEF’s consulting expertise in green building<br />

❘ Information for our Shareholders ❘ ❘ Management Report ❘ ❘ Financial Statements and Notes ❘<br />

across the Group. In the course of the year, additional<br />

HOCHTIEF projects were certified according to German<br />

Sustainable Building Council criteria.<br />

Tunneling research project completed<br />

In November 2009, “TUNCONSTRUCT,” a European<br />

Union-funded multi-disciplinary research project, was<br />

completed successfully. HOCHTIEF participated in the<br />

project from the very beginning and coordinated two<br />

work packages. The first involved development of control<br />

software to help minimize surface subsidence during<br />

shield driving in sensitive areas. The other project<br />

aimed to further develop materials for tunnel linings.<br />

The research and experiments demonstrated that the<br />

use of high-performance materials can reduce shell<br />

thickness and improve quality. We will integrate the<br />

knowledge gained from these projects into our business.<br />

inHaus2 activities continue<br />

In cooperation with partners, HOCHTIEF is continuing<br />

to use the inHaus2* research building in Duisburg, completed<br />

in 2008, as an opportunity to test innovative ideas<br />

for smart building systems. In 2009, we developed and<br />

tested projects for increasing the efficiency of facility<br />

management services, including a condition monitoring<br />

system. The aim of the project is to perform maintenance<br />

based on the current condition of the relevant<br />

facility rather than at the pre-set intervals currently<br />

used. The results of this project will help optimize processes<br />

at HOCHTIEF Facility Management, thereby<br />

reducing costs and boosting our competitiveness.<br />

Winners of the 2009 Solar<br />

Decathlon: The innovative<br />

“surPLUShome” produces<br />

more energy than it requires,<br />

but comfort is not sacrificed in<br />

achieving this extreme energy<br />

efficiency (photo at left).<br />

Our new Thor jack-up platform:<br />

Thanks to its 82-meter jack-up<br />

legs, the platform can serve at<br />

impressive depths for installing<br />

offshore wind turbines. Addition<br />

al advantages include a<br />

huge payload and large deck<br />

area, which allow the platform<br />

to be used even in stormy conditions.<br />

*For further information, please<br />

see www.inhaus-zentrum.de.<br />

Annual Report 2009 51

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!