10.07.2015 Views

ZONING REGULATIONS OF THE TOWN OF WILTON, CONNECTICUT

ZONING REGULATIONS OF THE TOWN OF WILTON, CONNECTICUT

ZONING REGULATIONS OF THE TOWN OF WILTON, CONNECTICUT

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

29-9.A.f. The sequence of grading and construction activities.g. The sequence for installation and/or application of control measures.h. The sequence for final stabilization of the development site.i. A narrative describing:(1) The proposed development.(2) The schedule for grading and construction activities, including start andcompletion dates, the sequence of grading and construction activities, thesequence for installation and/or application of control measures and thesequence for final stabilization for the site.(3) The design criteria for proposed control measures and stormwatermanagement facilities.(4) The construction details for proposed control measures and stormwatermanagement facilities.(5) The installation and/or application procedures for proposed controlmeasures and stormwater management facilities.(6) The operations and maintenance program for proposed control measuresand stormwater management facilities.j. Any other information deemed necessary and appropriate by the applicant orrequested by the Commission or its designated agent.6. Standards for Issuance or Denial of Certificationa. The Commission, or its designated agent, shall either certify that the Control Plan,as filed, complies with the requirements and objectives of this section or shall denycertification when the development proposal does not comply with this section.b. Nothing in this section shall be construed as extending the time limits for theapproval of any application under Chapters 124 or 126 of the General Statutes.c. Plans for control measures and the minimum standards for individual controlmeasures shall be based on the principles outlined in Connecticut Guidelines forSoil Erosion and Sediment Control (1985), as amended.d. Peak flow rates and runoff volumes shall be determined by using the rationalmethod, the time of concentration methods, the tabular method or the unithydrography method.e. The Commission may refer any Control Plan to the Conservation Commissionand/or the Fairfield County Soil and Water Conservation District for review andcomment.f. A proposed Control Plan shall bear the name, address, telephone number andsignature of the person responsible for implementing the plan. The Commission, orits designated agent, shall conduct inspections as may be required to ensure155

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!