10.07.2015 Views

ZONING REGULATIONS OF THE TOWN OF WILTON, CONNECTICUT

ZONING REGULATIONS OF THE TOWN OF WILTON, CONNECTICUT

ZONING REGULATIONS OF THE TOWN OF WILTON, CONNECTICUT

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

29-9.B.b. The ZEO may issue without a bond, a temporary permit to excavate and move up to1500 cubic yards of earth materials in any district to an adjacent property, providedpublic roads shall not be used. Such permit shall be valid for a period of 60 days.c. The ZEO may issue a temporary permit to excavate and move up to 1500 cubicyards earth materials in any district if done in conformance with an approved inlandwetlands permit.4. Special Permit for Earth Removal: Except as otherwise provided for herein, the removal ofearth materials from any property of more than 400 cubic yards of earth materials, exceptas part of a bona fide construction operation, as evidenced by an approved Site Plan, anapproved Subdivision or Resubdivision Plan, a valid Building Permit, or approved inlandwetlands permit, shall be subject to Special Permit approval in accordance with 29-10 andwith the requirements of this section.a. As part of the Special Permit application, the applicant shall submit maps, plans andcross-sections prepared by a surveyor, landscape architect or engineer licensed topractice in the State which, at a minimum, shall contain the following information:(1) The boundaries of the entire property, the location and extent of the earthremoval operation, any wetlands and watercourses, any wooded areas(denoted by foliage lines), and all intersecting streets within 200 feet of theproperty.(2) Existing contours of the entire property and for 20 feet beyond, and proposedfinal contours of the area of the earth removal operation. Contours shall bebased on USGS datum and drawn at an interval not to exceed two feet.Existing contours shall be based upon an actual field survey or an aerialsurvey with established ground elevations.(3) The amount of material, in cubic yards, proposed to be removed from thearea of the earth removal operation.(4) Longitudinal and transverse cross-sections of the area of the earth removaloperation at intervals no greater than 50 feet, showing existing contours andproposed final contours.(5) An Erosion and Sedimentation Control Plan in accordance with 29-9.A.(6) The location, surface treatment and grading of truck access to the property.(7) The location, type, size and purpose of any existing and proposed buildings,structures and equipment proposed to be used for storage or processing ofearth materials on the property; proposed areas for the stockpiling ofmaterials.(8) A concept plan showing the possible re-use of the property after completionof the earth removal operation. The concept plan shall show general buildingand parking locations, a general layout of storm drainage and sanitary sewer157

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!