10.07.2015 Views

ZONING REGULATIONS OF THE TOWN OF WILTON, CONNECTICUT

ZONING REGULATIONS OF THE TOWN OF WILTON, CONNECTICUT

ZONING REGULATIONS OF THE TOWN OF WILTON, CONNECTICUT

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

29-9.A.compliance with the approved plan and that control measures have been properlyinstalled and maintained.7. Bond Requirement/Inspectiona. Site development shall not begin unless the Control Plan has been certified andthose control measures and facilities in the plan scheduled for installation prior tosite development have been installed and functional and a bond therefor has beenposted and accepted in accordance with 29-11.A.12.b. Inspection shall be made by the Commission or its designated agent during thedevelopment to ensure compliance with the certified plan. The Commission mayrequire the permittee to verify through progress reports that control measures andfacilities have been performed or installed according to the certified plan.c. Upon completion of all work specified in the certified plan the applicant shall notifythe Commission thereof and submit a report, including maps as necessary,certifying that the control measures have been completed as approved or as mayhave been modified with the prior approval by the Commission or its designatedagent. Upon receipt of the report and inspection of the site by the Commission orits designated agent, the Commission may release any bond posted upon thefinding that the provisions of the certified plan have been complied with.B. REMOVAL <strong>OF</strong> EARTH MATERIALS1. Purpose: To regulate the removal of certain earth materials from the ground and from theproperty on which they are located in a manner that will not adversely affect thesurrounding neighborhood; that will not result in unsafe, unsightly or unsanitary conditions;that will result in land which in the future can be put to a use permitted by theseRegulations; that will not adversely affect public or private water supplies; and that willprotect the land from erosion and sedimentation.2. General Provisionsa. Except as otherwise provided for herein there shall be no removal of earth materialsfrom any property in any district.b. Nothing in this section shall prevent the regrading of property or the moving of earthmaterials entirely within the property lines of a single parcel, provided that no earthmaterials shall be removed from such parcel to any other property.3. Temporary Permit for Earth Removala. Where a bona fide building construction operation, as evidenced by an approvedSite Plan, an approved Subdivision or Resubdivision Plan, a valid Building Permit,or septic system permit requires the removal from the property of not more than 400cubic yards of earth materials, the ZEO may issue without a bond a temporarypermit for earth removal. Such permit shall be valid for a period of 60 days. Suchtime period may be extended once by the ZEO.156

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!