10.07.2015 Views

ZONING REGULATIONS OF THE TOWN OF WILTON, CONNECTICUT

ZONING REGULATIONS OF THE TOWN OF WILTON, CONNECTICUT

ZONING REGULATIONS OF THE TOWN OF WILTON, CONNECTICUT

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5. Existing Earth Removal Operations29-9.B.a. For those existing earth removal operations which have a valid Special Permit as ofthe effective date of these Regulations, the Commission shall require that thefollowing information be submitted either as part of an application to renew theexisting Special Permit for earth removal or as part of an application for a newSpecial Permit for earth removal on the property:(1) The location and extent of the existing earth removal operation.(2) The estimated amount of material, in cubic yards, removed since the earthremoval operation originally began.(3) Items (1) through (8) in Section 29-9-B.4.a above.b. In granting or renewing a Special Permit for earth removal for an existing operation,the Commission may attach any of the other requirements and conditions of thissection as it may deem necessary to protect the public health, safety and generalwelfare.C. FILLING <strong>OF</strong> LAND1. General Provisionsa. Except as otherwise provided for herein, there shall be no filling of land on anyproperty in any district.b. Nothing in this section shall prevent the regrading of property or the moving of earthmaterials entirely within the property lines of a single parcel, provided that no earthmaterials shall be used from any other property.2. Site Plan Approvala. The filling of land shall require approval of the Commission unless the operationshall be for the express purpose of preparing the land for immediate development inaccordance with a Site Plan or Subdivision Plan which has been approved by theCommission, done in conformance with an approved inland wetlands permits or anapproved building permit; or unless the amount of such fill shall be less than 100cubic yards in any 12-month period, or where the deposit shall be one of topsoil forthe purpose of improving an agricultural use.b. All filling of land except where exempted above in Section 29-9.C.2.a. shall besubject to Site Plan approval in accordance with Section 29-11. The Commissionmay modify such requirements if it determines that they are not fully applicable; andmay hold a public information meeting if, in its judgment, the nature of the Site Planshall be such that the public should have an opportunity to be heard. No Site Planshall be approved for any filling operation unless accompanied by a bond inaccordance with 29-11.A.13.160

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!