South Dublin County Council N7 <strong>Newlands</strong> <strong>Cross</strong> <strong>Upgrade</strong><br />

Environmental Impact Statement<br />

Arup Consulting Engineers<br />

4.2.5.5 Belgard Road<br />

The existing wide grassed median will be reduced to a 0.5 m wide minimum concrete median.<br />

A parallel service road will relocate the private direct access for “Moreen” to the new<br />

signalised junction for the Golf Club. This junction will also provide safe access to Belgard<br />

Road to the 10 no. houses on the old Belgard Road. The design of the junction can readily<br />

accommodate a future Metro in this area, with the Metro likely to cross from the northeast<br />

side of the junction to the median through the junction. Consistent with elsewhere on the<br />

scheme, all lane widths are 3.2 m. The road geometry in this area has been devised to limit<br />

the amount of third party land acquisition, with almost all the road improvement works<br />

occurring within the road curtilage.<br />

4.2.6 Bridge Structure<br />

The proposed flyover structure at <strong>Newlands</strong> <strong>Cross</strong> is a two span prestressed concrete integral<br />

bridge deck,. A central pier is to be located within the traffic island which separates<br />

northbound and southbound traffic through the junction on the R113 Belgard Road. The<br />

recommended method of constructing the approach embankments to the bridge is to adopt<br />

reinforced soil with modular split stone block facing panels. The structure shall be designed<br />

for a 120 year design life<br />

It is proposed that the bridge abutment and intermediate pier foundations consist of reinforced<br />

concrete spread or pad footings founded on top of the competent limestone bedrock which is<br />

estimated to be approximately 3m to 4m below existing ground.<br />

It is anticipated that a high containment kerb will be required around the base of the<br />

intermediate pier traffic island to redirect vehicles and significantly reduce the risk of collision<br />

with the intermediate pier.<br />

A hard landscaping design with effective lighting will be required beneath the bridge deck to<br />

provide a safe and comfortable environment for pedestrians and cyclists.<br />

4.2.7 Traffic Signs<br />

The proposed upgrade of <strong>Newlands</strong> <strong>Cross</strong> will require large verge mounted advance direction<br />

signs, overhead portal gantry signs and cantilever gantry signs. The design and positioning of<br />

these signs will be in accordance with current NRA standard practice. Some of the signs will<br />

be positioned outside the extent of the road upgrade works and their supports can be placed<br />

within the road curtailage. Allowance has been made in the proposed scheme for the<br />

positioning of large sign supports.<br />

4.2.8 Safety Fencing and Barriers<br />

Safety Fences and Barriers are proposed at locations as required under the NRA DMRB.<br />

Road edges on embankment supports to large signs and structures will have appropriate<br />

protection. The adoption of a narrow median requires the use of a concrete median barrier on<br />

the N7 mainline. All kerbing along the N7 mainline west of <strong>Newlands</strong> <strong>Cross</strong> and on the<br />

reinforced earth elevated section, will have a chamfered 75mm upstand to mitigate against the<br />

possibility of errant vehicles being launched by the kerb.<br />

For this scheme, the mainline vertical geometry provides scope for construction of at grade on<br />

and off ramps on both side of the junction location. Thus the requirement for vehicle safety<br />

barriers is minimised along the ramps.<br />

The existing boundary treatment has been retained as far as practicable throughout the<br />

scheme. A stone faced pre-cast concrete wall mostly of 1.3m height is proposed along<br />

northern and southern part of N7. A 2m high stone faced pre-cast concrete wall is also<br />

December 2007 Page 71