South Dublin County Council N7 <strong>Newlands</strong> <strong>Cross</strong> <strong>Upgrade</strong><br />

Environmental Impact Statement<br />

Arup Consulting Engineers<br />

The incorporation of these measures into the fundamental design of the scheme offers a<br />

significant level of noise attenuation to locations within the golf club grounds when compared<br />

against the situation without these measures.<br />

It is also expected that levels will most likely be only slightly higher than the current Do<br />

Minimum levels given the additional attenuation.<br />

Therefore, the proposed road will not have a significant noise impact on the facilities at the<br />

<strong>Newlands</strong> Golf Club.<br />

8.4 Description of Mitigation Measures<br />

Receiver<br />

Location<br />

Locations R03, R04, R05, R06 and R07<br />

The proposed mitigation for Locations R03, R04, R05, R06 and R07 consists a 1.5m high and<br />

325m long barrier 4 along the northern side of the N7 overpass. The location of this barrier is<br />

shown in Figure 8.4.<br />

With this mitigation measure in place, the predicted results for the 2025 ‘Do Something’<br />

scenario is less than or equal to the Do Nothing values for these five locations. This means<br />

that Condition (b) of the Design Goals (refer to Section 8.1.3) is no longer satisfied, and<br />

therefore the mitigated noise levels satisfy the adopted criteria. The mitigated result is<br />

detailed in Table 8.8 overleaf.<br />

It should be noted that the mitigation measure proposed here is based on the design of the<br />

scheme as presented. Should the contractor propose a modified design, a detailed review of<br />

this mitigation measure in light of the modified design will be required.<br />

Table 8.8: Predicted Noise Levels for Years 2010 and 2025 for 'Do-Minimum' and 'Do-<br />

Something' Scenarios Considering Mitigation Measures for NRA Guidelines<br />

Opening Year 2010 Design Year 2025<br />

Predicted Noise Level Predicted Noise Level<br />

Do<br />

Minimum<br />

Lden<br />

Do<br />

Something<br />

Lden<br />

Mitigation<br />

Required?<br />

Do<br />

Minimum<br />

Lden<br />

Do<br />

Something<br />

Lden<br />

Mitigation<br />

Required?<br />

R01 76 75 No 76 75 No<br />

R02 75 75 No 76 76 No<br />

R03 69 69 No 69 69 No<br />

R04 68 68 No 68 68 No<br />

R05 68 68 No 69 68 No<br />

R06 69 69 No 70 69 No<br />

R07 69 68 No 69 69 No<br />

R08 72 72 No 73 72 No<br />

R09 69 69 No 70 70 No<br />

R10 73 72 No 74 73 No<br />

R11 70 69 No 71 70 No<br />

R12 69 69 No 70 69 No<br />

R13 69 69 No 70 70 No<br />

R14 70 69 No 70 69 No<br />

R15 64 63 No 65 64 No<br />

R16 72 71 No 72 72 No<br />

R17 72 71 No 73 72 No<br />

R18 72 71 No 73 72 No<br />

R19 72 70 No 73 71 No<br />

December 2007 Page 127