South Dublin County Council N7 <strong>Newlands</strong> <strong>Cross</strong> <strong>Upgrade</strong><br />

Environmental Impact Statement<br />

Arup Consulting Engineers<br />

Table 3.4: Predicted Noise Levels for Years 2010 and 2025 for 'Do-Minimum' and 'Do-Something<br />

- Underpass' Scenarios<br />

Receiver<br />

Location<br />

Overpass:<br />

Opening Year 2010 Design Year 2025<br />

Predicted Noise Level Predicted Noise Level<br />

Do<br />

Do Mitigation Do<br />

Do Mitigation<br />

Minimum Something Required? Minimum Something Required?<br />

Lden<br />

Lden<br />

R01 76 75 No 76 76 No<br />

R02 75 75 No 76 76 No<br />

R03 69 69 No 69 69 No<br />

R04 68 68 No 68 68 No<br />

R05 68 66 No 69 66 No<br />

R06 69 67 No 70 68 No<br />

R07 69 67 No 69 67 No<br />

R08 72 71 No 73 71 No<br />

R09 69 69 No 70 69 No<br />

R10 73 70 No 74 70 No<br />

R11 70 68 No 71 68 No<br />

R12 69 67 No 70 67 No<br />

R13 69 67 No 70 68 No<br />

R14 70 67 No 70 68 No<br />

R15 64 62 No 65 63 No<br />

R16 72 70 No 72 70 No<br />

R17 72 71 No 73 71 No<br />

R18 72 71 No 73 71 No<br />

R19 72 70 No 73 71 No<br />

R20 70 69 No 71 69 No<br />

R21 67 65 No 68 66 No<br />

R22 68 67 No 69 67 No<br />

R23 68 66 No 69 66 No<br />

R24 69 67 No 70 68 No<br />

R25 68 66 No 69 67 No<br />

The combined expected maximum traffic noise level from the proposed overpass scheme<br />

together with other traffic in the vicinity (i.e. Do Something – Overpass scenario) is greater<br />

than 60dB Lden at all twenty-five of the receptors assessed.<br />

The Do Something levels for twenty of these receptors is less than or equal to the predicted<br />

Do Nothing levels. Therefore Condition (b) of the Design Goals (refer to Section 3.8.1.3.2) is<br />

not satisfied and no mitigation measures are required at these receptors.<br />

Mitigation measures will be required for the remaining five receptor groups (i.e. R03, R04,<br />

R05, R06 and R07).<br />

The proposed mitigation for Locations R03, R04, R05, R06 and R07 consists a 1.5m high and<br />

325m long barrier along the northern side of the N7 overpass. Barriers should be constructed<br />

in accordance with the NRA Guidance Document ‘Manual of Contract Documents for Road<br />

Works 4 .<br />

Lden<br />

Lden<br />

December 2007 Page 30