South Dublin County Council N7 <strong>Newlands</strong> <strong>Cross</strong> <strong>Upgrade</strong><br />

Environmental Impact Statement<br />

Arup Consulting Engineers<br />

• There are a number of locations highlighted in this document where the proposed Scheme<br />

meets all three conditions that must be satisfied before noise mitigation measures are<br />

deemed necessary. In these instances, mitigation measures have been specified. Once<br />

mitigation measures have been assessed all locations comply with the adopted criterion.<br />

• It may be concluded that the proposed road Scheme complies with the appropriate<br />

guidance in relation to noise, hence the associated impact is considered acceptable.<br />

15.3.3.3 Vibration<br />

• It may be concluded that the proposed road Scheme is not expected to give rise to<br />

vibration that is either significantly intrusive or capable of giving rise to structural or even<br />

cosmetic damage.<br />

15.3.4 Air Quality<br />

• The residual impact on air quality as a result of the proposed scheme will not be<br />

significant.<br />

15.3.5 Climate<br />

• There will be no residual impact on climate as a result of the proposed scheme.<br />

15.3.6 Ecology<br />

• Minor negative impacts associated with the construction phase of the proposed junction<br />

upgrade and the use of temporary lands for traffic management during construction will be<br />

reduced through the effective implementation of the proposed mitigation and the overall<br />

impact of the scheme on ecology will be considered neutral.<br />

15.3.7 Archaeological, Architectural and Cultural Heritage<br />

• No residual impacts are envisaged, as all archaeological, architectural and cultural<br />

heritage issues will be resolved at the preconstruction and construction stages of the<br />

proposed road development.<br />

15.3.8 Material Assets<br />

15.3.8.1 Community<br />

• At <strong>Newlands</strong> <strong>Cross</strong> Golf Course, with the proposed mitigation measures in place, the<br />

Scheme will not have any significant detrimental effects on the playing of the course or<br />

it’s amenity.<br />

15.3.8.2 Property & Material Assets<br />

• Residual impacts cannot be assessed at this stage, as mitigation measures in the form of<br />

compensation are not part of the <strong>EIS</strong>.<br />

15.3.9 Surface Water and Drainage<br />

• There will be no significant residual impact on either the Ballymount Park / Camac<br />

combined surface water system or the Poddle and Dodder River systems arising from the<br />

upgrading of the <strong>Newlands</strong> <strong>Cross</strong> Junction.<br />

December 2007 Page 246