28.11.2012 Views

Newlands Cross Upgrade EIS - European Investment Bank

Newlands Cross Upgrade EIS - European Investment Bank

Newlands Cross Upgrade EIS - European Investment Bank

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

South Dublin County Council N7 <strong>Newlands</strong> <strong>Cross</strong> <strong>Upgrade</strong><br />

Appendices<br />

SEVERANCE - CONSTRUCTION<br />

Mitigation proposed<br />

Relative impact of<br />

construction<br />

Approx. number of<br />

properties/<br />

Description of impact during<br />

construction<br />

Nature of Impact Location /<br />

Sub-Group<br />

individuals.<br />

Slight negative Given the visual clutter caused<br />

by construction, pedestrian<br />

crossings will need to be<br />

clearly indicated.<br />

Modest number of<br />

journeys to community<br />

facilities<br />

Some short-term additional<br />

severance possible<br />

Current degree of<br />

Impact<br />

(Do-Minimum)<br />

Severance due to delay<br />

and poor journey<br />

amenity.<br />

Pedestrian journeys Clondalkin & Tallaght<br />

Fonthill or Belgard Rd.<br />

AMENITY – OPERATIONAL<br />

Mitigation proposed<br />

Impact after<br />

opening with<br />

Approx. number of<br />

properties/<br />

Description of impact<br />

following interchange<br />

Current degree of<br />

Impact<br />

(Do-Minimum)<br />

Significant loss of<br />

amenity due to delay<br />

and poor envir, etc.<br />

Significant loss of<br />

amenity due to poor<br />

envir and safety<br />

Nature of Impact Location /<br />

Sub-Group<br />

individuals.<br />

mitigation<br />

Modest number of Moderate positive Permit pedestrian crossings on<br />

pedestrian journeys (allowing for modest each side of interchange. Allow<br />

number of journeys) for wide footpath.<br />

Numerous journeys Moderate positive Provide sufficient width for<br />

cyclists with designated cycle<br />

waiting space on R113 ahead<br />

of traffic stop line plus short<br />

painted cycle lane for right<br />

turns.<br />

Significant gain in amenity due to<br />

reduced delay, proximity to<br />

vehicles and poor environment<br />

Significant gain in amenity due to<br />

reduced delay, proximity to<br />

vehicles, poor environment and<br />

safety<br />

Pedestrian journeys Clondalkin & Tallaght<br />

Fonthill or Belgard Rd.<br />

Cycle journeys Clondalkin & Tallaght<br />

Fonthill or Belgard Rd.<br />

Improved environment and safety Large number of journeys Slight positive<br />

Vicinity Fonthill Road Poor environment and<br />

safety for cyclists. Poor<br />

environment for<br />

pedestrians.<br />

Local journeys not<br />

involving crossings<br />

of Naas Road<br />

Significant loss of Gain in envir quality due to Properties on south side General Impacts Provide visual screening<br />

amenity to some improved air quality tempered by Newland’s Road<br />

householders<br />

visual intrusion<br />

No Impact Loss of Land One Golf Club Imperceptible (with Provide boundary wall,<br />

mitigation) mounding, landscaping and<br />

possibly retain high wire fence<br />

with netting. Realign Tee for<br />

Hole No. 7.<br />

Local residents Rockfield Road and<br />

<strong>Newlands</strong> estate<br />

Community Facility <strong>Newlands</strong> <strong>Cross</strong> Golf<br />

Club<br />

December 2007<br />

Arup Consulting Engineers

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!