South Dublin County Council N7 <strong>Newlands</strong> <strong>Cross</strong> <strong>Upgrade</strong><br />

Environmental Impact Statement<br />

Arup Consulting Engineers<br />

o Air Quality & Climate<br />

o Landscape & Visual<br />

o Socio-Economic<br />

o Water Resources and Drainage<br />

• Economics<br />

It was determined that the assessment of the environmental impacts should only focus on<br />

those impacts that would be different or more / less pronounced depending on the option<br />

chosen. A screening exercise was undertaken to identify those impacts. For example, in<br />

considering the Cultural Heritage and Archaeological Impacts, specialists from Margaret<br />

Gowan & Company were consulted. They acknowledged that while both alternatives would<br />

result in impacts on Cultural Heritage and Archaeology these impacts would be similar in<br />

magnitude of effect for both schemes and are therefore not addressed in this assessment.<br />

Similarly, consultations were also conducted with specialists regarding the potential impacts<br />

of both options on Operational Traffic, Soils, Geology, Hydrology, Hydrogeology and<br />

Ecology. These elements have also been excluded from this report as the impacts are similar<br />

in magnitude of effect for both schemes.<br />

3.7 Construction<br />

3.7.1 Introduction<br />

Construction of both schemes can be divided into the following principal activities:-<br />

• Construction of the temporary traffic diversions to the N7;<br />

• Construction of the overpass / underpass structure;<br />

• Construction of the N7 approach embankments/cuttings and road pavements;<br />

• Construction of the on (merge) and off (diverge) slip roads from the N7 mainline;<br />

• Alterations to the Fonthill Road South and the Belgard Road on the approaches to the<br />

junction;<br />

• Reinstatement and landscaping of the scheme.<br />

This section provides an outline of the general activities and issues associated with the<br />

construction of the proposed scheme including:-<br />

• Construction constraints;<br />

• Construction programme, staging and working hours;<br />

• Construction compound;<br />

• Generation, reuse and disposal of excavated material;<br />

• Construction traffic and access;<br />

• Preparatory works;<br />

• Public traffic management;<br />

• General construction methods.<br />

• Environmental Impacts associated with construction<br />

December 2007 Page 20