28.11.2012 Views

Newlands Cross Upgrade EIS - European Investment Bank

Newlands Cross Upgrade EIS - European Investment Bank

Newlands Cross Upgrade EIS - European Investment Bank

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

South Dublin County Council N7 <strong>Newlands</strong> <strong>Cross</strong> <strong>Upgrade</strong><br />

Environmental Impact Statement<br />

FIGURES<br />

Chpt Figure # Figure Name<br />

1 1.1 Proposed Scheme Location<br />

1.2 Proposed Scheme Plan<br />

1.3 Artists Impression of Proposed Scheme (No. 1)<br />

1.4 Artists Impression of Proposed Scheme (No. 2)<br />

1.5 Environmental Impact Assessment Approach<br />

2 N/A<br />

3 3.1 Existing Land Use<br />

3.2 Existing Junction Layout<br />

3.3 Underpass Scheme Plan<br />

3.4 Artists Impression – Underpass<br />

3.5a Traffic Management Overpass - 1 of 2<br />

3.5b Traffic Management Overpass - 2 of 2<br />

3.5c Traffic Management Underpass Phase 1 - 1 of 2<br />

3.5d Traffic Management Underpass Phase 1 - 2 of 2<br />

3.5e Traffic Management Underpass Phase 2 - 1 of 2<br />

3.5f Traffic Management Underpass Phase 2 - 2 of 2<br />

3.6 Visual Assessment Key Plan<br />

3.7 Overpass Context Section A-A at Chainage 800<br />

3.8 Overpass Context Section B-B at Chainage 1,000<br />

3.9 Underpass Context Section A-A at Chainage 800<br />

3.10 Underpass Context Section B-B at Chainage 1000<br />

3.11a Options Selection Matrix- Ranking Explanation<br />

3.11b Options Selection Matrix- Construction Phase<br />

3.11c Options Selection Matrix- Operational Phase<br />

4 4.1 Proposed Scheme Layout - Keyplan<br />

4.2 Proposed Scheme Layout - 1 of 4<br />

4.3 Proposed Scheme Layout - 2 of 4<br />

4.4 Proposed Scheme Layout - 3 of 4<br />

4.5 Proposed Scheme Layout - 4 of 4<br />

4.6 Section A-A at Chainage 800<br />

4.7 Section B-B at Chainage 1,000<br />

4.8 Longitudinal Section<br />

4.9 Permanent & Temporary Landtake<br />

4.10 Construction Methodology : Stage 1<br />

4.11 Construction Methodology : Stage 2<br />

4.12 Construction Methodology : Stage 3<br />

4.13 Construction Methodology : Stage 4<br />

4.14 Construction Methodology : Stage 5<br />

4.15 Construction Methodology : Stage 6<br />

4.16 Construction Methodology : Stage 7<br />

5 5.1 Existing Flows (2005) - AM Peak Hour<br />

5.2 Existing Flows (2005) - PM Peak Hour<br />

5.3 Existing Bus Facilities<br />

5.4 Bus Routes passing through Existing Junction<br />

5.5 Existing Cycle Facilities<br />

5.6 Existing Pedestrian <strong>Cross</strong>ings<br />

5.7 Proposed Signal Control Operation<br />

5.8 Proposed Bus Facilities<br />

5.9 Proposed Cycle Facilities<br />

5.10 Proposed Pedestrian <strong>Cross</strong>ings<br />

5.11 Do Minimum 2010 & 2025 AADTs<br />

5.12 Do Something 2010 & 2025 AADTs<br />

Arup Consulting Engineers<br />

December 2007 Page iv