Appendix B—Case HistoriesThe conduit is considered to be in a continued serviceable condition. Some new orincreased instances of spalling, cracking, and efflorescence are apparent. Severalinstances of efflorescence were no longer apparent. No material is being carriedwith the existing minor seeping flows observed. The next conduit condition surveyis scheduled for 2008 in conjunction with the next periodic inspection of the project.Lessons learned• Periodic conduit condition surveys and walk<strong>through</strong>s are essential for thoroughdam safety monitoring.• Use of different colors for different surveys in the drawings enhancesinterpretation of the condition of the conduit and allows for comparison withthe results of previous inspections.ReferenceU.S. Army Corps of Engineers, Engineering Regulation 1110-2-100, Periodic Inspectionand Continuing Evaluation of Completed Civil Works Structures, 1995.B-25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!