Appendix B—Case HistoriesFigure B-50.—Loveton Farms Dam failure as viewed from upstream. Notethat the walls of the failure area are nearly vertical. The constructionrecords indicate that a large portion of the embankment dam was placedprior to installation of the CMP.Figure B-51.—Loveton Farms Dam after failure as viewed from thedownstream end of the 78-in diameter CMP spillway. Note that one of theantiseep collars, which were about 14 feet square, is visible in the breach.B-61