APPENDIX A<br />

WATER AND SANITATION FOR HEALTH (WASH) PROJECT<br />

CRDER OF TECHNICAL DIRECTION (OTD) NUMBER 144<br />

March 7, 1983<br />

TO: Dr. Dennis Warner, Ph.D., P.E.<br />

WASH Contract Project Director<br />

FROM: Mr. Victor W.R. Wehman Jr., P.E., R.S. A L<br />

AID WASH Project Manager<br />

AID/S&T/H/%,S<br />

SUT JECT: Provision of Technical Assistance Under WASH Project<br />

Scope of Work for <strong>USAID</strong>/Malawi<br />

REFERENCES: A) Lilonrwe 00399, dated 2 Feb 1983<br />

B) Government of Malawi Request for Assistance<br />

1. WASH contractor reauested to provide technical assistance to<br />

<strong>USAID</strong>/alawi as per Ref A., para 1-6 with exception that one (1)<br />

consultant rather than the Two (2) requested will perform the<br />

services.<br />

2. WASH contractor/subcontractor/consultants authorized to expend<br />

up to 84 person days of effort over a five (5) month period to<br />

accomplish this technicalssistance effort.<br />

3. Contractor authorized to expend up to 70 person days of international<br />

and/or domestic per diem to accomplish this effort.<br />

4. Contractor to coordinate with AFR/DR/HN (J. Shepperd),.AFR/DR/ENG<br />

(J. Snead), Malawi Desk Officer and <strong>USAID</strong>/PC/Malawi and should<br />

provide copies of this OTD along with any ETA information, or interim<br />

reports as may be requested by S&T/H/ATS, AFR/DR or <strong>USAID</strong> staff.<br />

5. Contrac-'or authorized to provide up to one (1) international<br />

round trip from consultants home base through Washington D.C. (for<br />

briefing and preparation) to Malawi and return to consultants home<br />

base through Washington D.C. during life of this OTD.<br />

6. Contractor authorized local travel for consultants in Mal~wi<br />

NTE t900 without the written approval of the AID WASH Project Manager.<br />

7. Contractor authorized to obtain secretarial, graphics or<br />

reproduction or piecework assistance ( miscellaneous) services in<br />

Malawi or WASH CIC as necessary and appropriate to accomplish tasks.<br />

These services are in addition to the level of effort specified in<br />

para 2 and 3 above and NTE t1900 without the prior written approval<br />

of the AID WASH Project Manager. ,Drsser a hICK , Inc;<br />

-20­<br />

WASH PROJECT<br />

MAR 0 81983